Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution

被引:36
|
作者
Birjandi, Alireza [1 ]
Mousavi, S. Meysam [2 ]
机构
[1] Islamic Azad Univ, South Tehran Branch, Dept Ind Engn, Tehran, Iran
[2] Shahed Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Resource-constrained project scheduling problem (RCPSP); Trapezoidal fuzzy numbers; Multiple routes; Uncertainty; Distribution rules; PSO; GA; CRITICAL PATH; MATHEMATICAL-MODELS; ALGORITHM; RCPSP; SOLVE; SELECTION;
D O I
10.1016/j.autcon.2018.11.029
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The resource-constrained project scheduling problem (RCPSP) with multiple routes by considering flexible activities is one of important subjects in project scheduling problems. The ability to select an appropriate route for implementing the flexible activities is a rational reason for indicating more complexity of the problem relative to common RCPSP that attracted the attention of the researchers in the recent decade. On the other hand, due to lack of access to project crisp information, the needs to consider uncertainty concepts in the RCPSP will be significant. Hence, in this paper, a new fuzzy mixed integer nonlinear programming (MINLP) model is presented under uncertain conditions. A hybrid meta-heuristic approach is also proposed to minimize costs of project completion. In this approach, to generate high quality initial solutions, a heuristic algorithm is designed based on distribution rules. Then, to change and assign an appropriate route from available routes for flexible activities, a meta-heuristic algorithm is presented based on binary particle swarm optimization (PSO). Finally, to generate best solution from routes assigned by the binary PSO, a meta-heuristic based on genetic algorithm (GA) is proposed. To appraise the effectiveness of presented model, different test problems are solved by the proposed approach, and comparisons are provided with results obtained by the GA and PSO.
引用
收藏
页码:84 / 102
页数:19
相关论文
共 50 条
  • [1] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [2] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    Annals of Operations Research, 2001, 102 : 65 - 81
  • [3] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [4] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81
  • [5] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [6] Comparison of Heuristic Priority Rules in the Solution of the Resource-Constrained Project Scheduling Problem
    Turkakin, Osman Hurol
    Arditi, David
    Manisali, Ekrem
    SUSTAINABILITY, 2021, 13 (17)
  • [7] Designing a resource-constrained project scheduling model considering multiple routes for flexible project activities: Meta-heuristic algorithms
    Birjandi, A.
    Mousavi, S. M.
    Vahdani, B.
    SCIENTIA IRANICA, 2020, 27 (05) : 2572 - 2591
  • [8] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [9] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [10] A neural network based heuristic for resource-constrained project scheduling
    Shou, YY
    ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 794 - 799