A neural network based heuristic for resource-constrained project scheduling

被引:0
|
作者
Shou, YY [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou 310027, Zhejiang, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource-constrained project scheduling allocates scarce resources over time to perform a set of activities. Priority rule-based heuristics are the most widely used scheduling methods though their performance depends on the characteristics of the projects. To overcome this deficiency, a feed-forward neural network is designed and integrated into the scheduling scheme so as to automatically select the suitable priority rules for each stage of project scheduling. Testing on Patterson's classic test problems and comparison with other heuristics show that the proposed neural network based heuristic is able to improve the performance of project scheduling.
引用
收藏
页码:794 / 799
页数:6
相关论文
共 50 条
  • [1] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [2] Entropy-Based Heuristic for Resource-Constrained Project Scheduling
    Christodoulou, Symeon E.
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (03)
  • [3] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [4] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    [J]. COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [5] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    [J]. Annals of Operations Research, 2001, 102 : 65 - 81
  • [6] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    [J]. NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [7] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301
  • [8] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [9] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [10] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81