A Heuristic Approach for Rework-Based Product Design Project Scheduling Problem

被引:0
|
作者
lu, Rui [1 ]
Li, Linying [2 ]
机构
[1] Northeastern Univ, Key Lab Proc Ind Automat, Minist Educ, Shenyang 110004, Peoples R China
[2] Chinese Acad Sci, Shenyang Inst Automat, Shenyang 110016, Peoples R China
关键词
Stochastic RCPSP; Overlap; Iteration; Product Design Project; Simulation;
D O I
10.1109/CCDC.2008.4597565
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Product design project scheduling is a complex problem which involves a large number of tasks and information exchanges in a stochastic, resource-constrained project network where iteration and overlap between tasks often take place. The classical determined RCPSP which has been widely studied is based on assumption of fixed duration of tasks and zero-lag finish-start precedence relationships in acyclic AON network. Very little efforts have been made in project scheduling with stochastic duration, especially in cyclic network with rework possibility. This paper presents an approach for rework-based product design project scheduling problem, taking overlap and iteration which are inherent nature in PDP into account. We consider this problem under the assumption that task duration can be modeled by a triangle distribution and can be sampled by simulation techniques. Three priority rules which are widely used in solving deterministic RCPSP are modified by replacing deterministic duration by a dynamic one. Finally computational experiments for this heuristic approach are provided.
引用
下载
收藏
页码:1486 / 1491
页数:6
相关论文
共 50 条
  • [1] A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework
    Zhu, Hongwei
    Lu, Zhiqiang
    Hu, Xinming
    2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 1058 - 1063
  • [2] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [3] An Automatic Heuristic Design Approach for Seru Scheduling Problem with Resource Conflicts
    Zhan, Rongxin
    Zhang, Jinhui
    Cui, Zihua
    Peng, Jin
    Li, Dongni
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [4] A HEURISTIC APPROACH TO PRODUCT DESIGN
    KOHLI, R
    KRISHNAMURTI, R
    MANAGEMENT SCIENCE, 1987, 33 (12) : 1523 - 1533
  • [5] The application of an admissible heuristic algorithm to project scheduling problem
    Zamani, R
    Shue, LY
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 1997, 10 (5-6) : 308 - 315
  • [6] PROJECT SCHEDULING - EFFECTS OF PROBLEM STRUCTURE ON HEURISTIC PERFORMANCE
    PATTERSON, JH
    NAVAL RESEARCH LOGISTICS, 1976, 23 (01) : 95 - 123
  • [7] A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem
    Chen, HaoJie
    Ding, Guofu
    Qin, Shengfeng
    Zhang, Jian
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167
  • [8] Multi-product unrelated parallel machines scheduling problem with rework processes
    Ramezanian, R.
    Saidi-Mehrabad, M.
    SCIENTIA IRANICA, 2012, 19 (06) : 1887 - 1893
  • [9] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [10] A HEURISTIC APPROACH TO THE BUS DRIVER SCHEDULING PROBLEM
    MARTELLO, S
    TOTH, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (01) : 106 - 117