A Heuristic Approach for Rework-Based Product Design Project Scheduling Problem

被引:0
|
作者
lu, Rui [1 ]
Li, Linying [2 ]
机构
[1] Northeastern Univ, Key Lab Proc Ind Automat, Minist Educ, Shenyang 110004, Peoples R China
[2] Chinese Acad Sci, Shenyang Inst Automat, Shenyang 110016, Peoples R China
关键词
Stochastic RCPSP; Overlap; Iteration; Product Design Project; Simulation;
D O I
10.1109/CCDC.2008.4597565
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Product design project scheduling is a complex problem which involves a large number of tasks and information exchanges in a stochastic, resource-constrained project network where iteration and overlap between tasks often take place. The classical determined RCPSP which has been widely studied is based on assumption of fixed duration of tasks and zero-lag finish-start precedence relationships in acyclic AON network. Very little efforts have been made in project scheduling with stochastic duration, especially in cyclic network with rework possibility. This paper presents an approach for rework-based product design project scheduling problem, taking overlap and iteration which are inherent nature in PDP into account. We consider this problem under the assumption that task duration can be modeled by a triangle distribution and can be sampled by simulation techniques. Three priority rules which are widely used in solving deterministic RCPSP are modified by replacing deterministic duration by a dynamic one. Finally computational experiments for this heuristic approach are provided.
引用
下载
收藏
页码:1486 / 1491
页数:6
相关论文
共 50 条
  • [31] A hybrid heuristic for the multi-product straight pipeline scheduling problem
    Bamoumen, M.
    Belil, S.
    Elfirdoussi, S.
    Ren, L.
    Tchernev, N.
    IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
  • [32] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [33] Heuristic Optimization for the Resource Constrained Project Scheduling Problem: a Systematic Mapping
    Ciupe, Aurelia
    Meza, Serban
    Orza, Bogdan
    PROCEEDINGS OF THE 2016 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2016, 8 : 619 - 626
  • [34] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [35] A Novel Heuristic Algorithm for Spatial Resource Constrained Project Scheduling Problem
    Yu, Xiaoguang
    Zhan, Dechen
    Nie, Lanshun
    INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 1448 - 1453
  • [36] A Dynamic Programming Approach for Solving the IFM Based Project Scheduling Problem
    Tselios, Dimitrios
    Ipsilandis, Pandelis
    Gerogiannis, Vassilis C.
    PROCEEDINGS 41ST EUROMICRO CONFERENCE ON SOFTWARE ENGINEERING AND ADVANCED APPLICATIONS SEAA 2015, 2015, : 127 - 134
  • [37] A New Heuristic Approach For Vehicle Scheduling Problem Combined With Aspects From Driver Scheduling Problem
    Oughalime, Ahmed
    Zirour, Mourad
    Ismail, Wan Rosmanira
    4TH INTERNATIONAL CONFERENCE ON QUANTITATIVE SCIENCES AND ITS APPLICATIONS (ICOQSIA 2016), 2016, 1782
  • [38] A Q-learning-based Automatic Heuristic Design Approach for Seru Scheduling
    Zhan, Rongxin
    Cui, Zihua
    Ma, Tao
    Li, Dongni
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 253 - 257
  • [39] Heuristic approach for solving a pipe layer fleet scheduling problem
    Queiroz, M. M.
    Mendes, A. B.
    SUSTAINABLE MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2012, : 1073 - 1080
  • [40] Heuristic approach for the multiobjective optimization of the customized bus scheduling problem
    Liu, Kaijun
    Liu, Jianming
    Zhang, Jingwei
    IET INTELLIGENT TRANSPORT SYSTEMS, 2022, 16 (03) : 277 - 291