Study on Underway Replenishment Scheduling Project of Naval Battle Group Based on Heuristic Approach

被引:0
|
作者
Yu Peng [1 ]
He Xuejun [1 ]
Tan Zhiyou [1 ]
机构
[1] Naval Univ Engn, NUE Logist Acad, Tianjin, Peoples R China
关键词
heuristic approach; underway replenishment; scheduling;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study formulates a model to solve the scheduling problem of underway replenishment of naval battle group. First, an analogy is made between the underway replenishment scheduling project of naval battle group (URSP) and vehicle scheduling Problem (VSP). Then the impact factors to URSP based on the analysis of the similarity and difference between URSP and VSP are figured out and analyzed. The model of URSP is described, and its parameters are analyzed, and the quantitative approaches are given. The heuristic approach is provided to solve URSP, and an example is used to validate its feasibility, then the replenishment sequence is worked out. The result indicates that the model and the heuristic approach can be used to solve the URSP with complex constraints well, the result can be used as the support of decision-making.
引用
收藏
页码:1943 / 1946
页数:4
相关论文
共 50 条
  • [21] Term-based approach to project scheduling
    Kim, PS
    Schmidt-Schauss, M
    CONCEPTUAL STRUCTURES: BROADENING THE BASE, PROCEEDINGS, 2001, 2120 : 304 - 318
  • [23] Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem
    Chakrabortty, R. K.
    Ryan, M. J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1157 - 1161
  • [24] Cloud Scheduling using Hybrid Heuristic based HEFT and Enhanced GRASP Approach: A Study and Analysis
    Kumaresan, M.
    Venkatesan, G. K. D. Prasanna
    2016 8TH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND COMMUNICATION NETWORKS (CICN), 2016, : 48 - 51
  • [25] A heuristic rule adaptive selection approach for multi-work package project scheduling problem
    Zhang, Yaning
    Li, Xiao
    Teng, Yue
    Shen, Geoffrey Qiping
    Bai, Sijun
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [26] An optimization-based approach for design project scheduling
    Ni, Ming
    Luh, Peter B.
    Moser, Bryan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2008, 5 (03) : 394 - 406
  • [27] An optimization-based approach for distributed project scheduling
    Ni, M
    Luh, PB
    Moser, B
    2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, : 1756 - 1761
  • [28] Task Scheduling in Cloud Computing: A Priority-Based Heuristic Approach
    Lipsa, Swati
    Dash, Ranjan Kumar
    Ivkovic, Nikola
    Cengiz, Korhan
    IEEE ACCESS, 2023, 11 : 27111 - 27126
  • [29] Production Scheduling based on Tabu and Scatter Search Techniques with an Heuristic Approach
    Savino, Matteo Mario
    2008 10TH INTERNATIONAL CONFERENCE ON CONTROL AUTOMATION ROBOTICS & VISION: ICARV 2008, VOLS 1-4, 2008, : 934 - 938
  • [30] Heuristic Grid Resource Scheduling Algorithm based on Group of Task and Secondary Distribution
    Zhang, Zhongping
    Feng, Yupeng
    Zhang, Shan
    Sun, Ying
    INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2015, 9 (08): : 427 - 438