Client perspective based multi-mode project payment scheduling problem and its heuristic

被引:0
|
作者
School of Management, Xi'an Jiaotong University, Xi'an 710049, China [1 ]
机构
来源
Xitong Gongcheng Lilum yu Shijian | 2009年 / 2卷 / 70-77期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Study on integrated optimization of multi-mode project payment scheduling
    School of Management, Xi'an Jiaotong University, Xi'an 710049, China
    Xitong Gongcheng Lilum yu Shijian, 2006, 1 (76-83):
  • [2] Learning agents for the multi-mode project scheduling problem
    Wauters, T.
    Verbeeck, K.
    Vanden Berghe, G.
    De Causmaecker, P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (02) : 281 - 290
  • [3] A Critical Chain Project Scheduling Problem with Multi-mode
    Peng, W. L.
    Jiao, Q. J.
    ADVANCES IN MATERIALS MANUFACTURING SCIENCE AND TECHNOLOGY XIV, 2012, 697-698 : 541 - 545
  • [4] Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem
    Chakrabortty, R. K.
    Ryan, M. J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1157 - 1161
  • [5] Metaheuristics for multi-mode capital-constrained project payment scheduling
    He, Zhengwen
    Liu, Renjing
    Jia, Tao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 223 (03) : 605 - 613
  • [6] Simulated annealing and tabu search for multi-mode project payment scheduling
    He, Zhengwen
    Wang, Nengmin
    Jia, Tao
    Xu, Yu
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 198 (03) : 688 - 696
  • [7] Flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
    Yeditepe Univ, Istanbul, Turkey
    Romput Oper Res, 12 (1187-1200):
  • [8] A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
    Ozdamar, L
    Dundar, H
    COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (12) : 1187 - 1200
  • [9] A HYBRID META-HEURISTIC ALGORITHM FOR MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM
    Fu, Fang
    Zhou, Hong
    ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, : 145 - 150
  • [10] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    OR SPEKTRUM, 2001, 23 (03) : 335 - 357