Client perspective based multi-mode project payment scheduling problem and its heuristic

被引:0
|
作者
School of Management, Xi'an Jiaotong University, Xi'an 710049, China [1 ]
机构
来源
Xitong Gongcheng Lilum yu Shijian | 2009年 / 2卷 / 70-77期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [22] A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
    Liu Changchun
    Xiang Xi
    Zhang Canrong
    Wang Qiang
    Zheng Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 258 - 278
  • [23] A genetic algorithm for multi-mode resource constrained project scheduling problem
    Mori, M
    Tseng, CC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 134 - 141
  • [24] A matheuristic approach to the multi-mode resource constrained project scheduling problem
    Fernandes, Gustavo Alves
    de Souza, Sergio Ricardo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
  • [25] Q-learning based hyper-heuristic algorithm for solving multi-mode resource-constrained project scheduling problem
    Cui J.
    Lyu Y.
    Xu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (05): : 1472 - 1481
  • [26] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [27] Multi-mode multi-project scheduling problem for mould production in MC enterprise
    Shan Miyuan
    Qu Hong
    Wu Juan
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5316 - 5320
  • [28] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [29] Estimation of Distribution Algorithms for the Multi-Mode Resource Constrained Project Scheduling Problem
    Ayodele, Mayowa
    McCall, John
    Regnier-Coudert, Olivier
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 1579 - 1586
  • [30] BPGA-EDA for the Multi-Mode Resource Constrained Project Scheduling Problem
    Ayodele, Mayowa
    McCall, John
    Regnier-Coudert, Olivier
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 3417 - 3424