Multi-mode resource-constrained project scheduling problem with alternative project structures

被引:48
|
作者
Tao, Sha [1 ]
Dong, Zhijie Sasha [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
[2] Texas State Univ, Ingram Sch Engn, Ind Engn Program, San Marcos, TX 78666 USA
基金
中国国家自然科学基金;
关键词
Multi-mode resource-constrained project scheduling; Time-cost trade-off; Alternative project structures; AND-OR network; Hybrid metaheuristic; ALGORITHM; HEURISTICS;
D O I
10.1016/j.cie.2018.08.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper proposes to consider alternative project structures when dealing with the multi-mode resource constrained project scheduling problem. An AND-OR network is used to present this alternative project structures innovatively. The problem is formulated as a bi-objective linear integer program, which minimizes the makespan and total cost. A hybrid metaheuristic is developed based on AND-OR network to solve this NP-hard problem efficiently, which nests adapted Tabu Search (outer layer) and NSGA-II algorithm (inner layer). A large amount of computational experiments of different sizes are conducted, and compared with solutions generated by CPLEX, traditional Tabu Search, enumeration-based method and single-layer NSGA-II. The experimental results show the advantages of the proposed model and method, especially with large-size problems.
引用
下载
收藏
页码:333 / 347
页数:15
相关论文
共 50 条
  • [1] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [2] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [3] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566
  • [4] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [5] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Alessandro Hill
    Eduardo Lalla-Ruiz
    Stefan Voß
    Marcos Goycoolea
    Journal of Scheduling, 2019, 22 : 173 - 182
  • [6] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Hill, Alessandro
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    Goycoolea, Marcos
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 173 - 182
  • [7] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556
  • [8] Providing Lower Bounds for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Stuerck, Christian
    Gerhards, Patrick
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 551 - 557
  • [9] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626
  • [10] Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda
    Loukil, Taicir
    Fortemps, Philippe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167