Multi-mode resource-constrained project scheduling problem with alternative project structures

被引:48
|
作者
Tao, Sha [1 ]
Dong, Zhijie Sasha [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
[2] Texas State Univ, Ingram Sch Engn, Ind Engn Program, San Marcos, TX 78666 USA
基金
中国国家自然科学基金;
关键词
Multi-mode resource-constrained project scheduling; Time-cost trade-off; Alternative project structures; AND-OR network; Hybrid metaheuristic; ALGORITHM; HEURISTICS;
D O I
10.1016/j.cie.2018.08.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper proposes to consider alternative project structures when dealing with the multi-mode resource constrained project scheduling problem. An AND-OR network is used to present this alternative project structures innovatively. The problem is formulated as a bi-objective linear integer program, which minimizes the makespan and total cost. A hybrid metaheuristic is developed based on AND-OR network to solve this NP-hard problem efficiently, which nests adapted Tabu Search (outer layer) and NSGA-II algorithm (inner layer). A large amount of computational experiments of different sizes are conducted, and compared with solutions generated by CPLEX, traditional Tabu Search, enumeration-based method and single-layer NSGA-II. The experimental results show the advantages of the proposed model and method, especially with large-size problems.
引用
收藏
页码:333 / 347
页数:15
相关论文
共 50 条
  • [21] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [22] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [23] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [24] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [25] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [26] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [27] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [28] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [29] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Liu, Shixin
    Chen, Di
    Wang, Yifan
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (04) : 609 - 617
  • [30] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Sabzehparvar, Majid
    Seyed-Hosseini, S. Mohammad
    JOURNAL OF SUPERCOMPUTING, 2008, 44 (03): : 257 - 273