A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
被引:18
|
作者:
Liu Changchun
论文数: 0引用数: 0
h-index: 0
机构:
Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R ChinaTsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Liu Changchun
[1
]
Xiang Xi
论文数: 0引用数: 0
h-index: 0
机构:
Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Tsinghua Univ, Grad Sch Shenzhen, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R ChinaTsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Xiang Xi
[1
,2
]
Zhang Canrong
论文数: 0引用数: 0
h-index: 0
机构:
Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Tsinghua Univ, Grad Sch Shenzhen, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R ChinaTsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Zhang Canrong
[1
,2
]
Wang Qiang
论文数: 0引用数: 0
h-index: 0
机构:
Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R ChinaTsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
Wang Qiang
[1
]
论文数: 引用数:
h-index:
机构:
Zheng Li
[1
]
机构:
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Grad Sch Shenzhen, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R China
This study develops a column generation-based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem. The proposed distributed algorithm shares less information among independent decision makers compared with the traditional integrated approach. In this problem, many independent processors, which can produce different types of products, coordinate with a resource manager (or third-party logistic), who provides different types of vehicles to deliver products to the customers. The problem is decomposed into two parts: production planning for individual processors and vehicle scheduling for the resource manager. A total of 1200 instances are randomly generated to verify the effectiveness of the proposed distributed algorithm. Results of computational experiments verify that the proposed distributed algorithm has good solution quality and calculation efficiency compared with the integrated approach, i.e., CPLEX, hybrid Benders Decomposition, and Lagrangian Relaxation. Lastly, a general framework for the distributed algorithm is proposed to solve a generalized problem.
机构:
Research Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, CubaResearch Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, Cuba
Mahdi, Gaafar Sadeq S.
Quintana, Julio Madera
论文数: 0引用数: 0
h-index: 0
机构:
Department of Computer Science, Camagüey University, Camagüey, CubaResearch Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, Cuba
Quintana, Julio Madera
Pérez, Pedro Piñero
论文数: 0引用数: 0
h-index: 0
机构:
Research Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, CubaResearch Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, Cuba
Pérez, Pedro Piñero
Al-Subhi, Salah Hassan
论文数: 0引用数: 0
h-index: 0
机构:
Research Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, CubaResearch Laboratory in Project Management, University of Informatics Sciences, San Antonio km 2 1/2, La Habana,CP 17830, Cuba
机构:
Univ Adolfo Ibanez, Sch Business, Santiago, Chile
Calif Polytech State Univ San Luis Obispo, Dept Ind & Mfg Engn, San Luis Obispo, CA 93407 USAUniv Adolfo Ibanez, Sch Business, Santiago, Chile