Multi-project scheduling problem under shared multi-skill resource constraints

被引:6
|
作者
Haroune, Meya [1 ,2 ,3 ]
Dhib, Cheikh [2 ,3 ]
Neron, Emmanuel [1 ]
Soukhal, Ameur [1 ]
Babou, Hafed Mohamed [2 ,4 ]
Nanne, Mohamedade Farouk [2 ]
机构
[1] Univ Tours, Lab Informat Fondamentale & Appl Tours LIFAT ROOT, CNRS, Tours, France
[2] Univ Nouakchott Al Aasriya, Unite Rech Calcul Sci Informat & Data Sci, Nouakchott, Mauritania
[3] Inst Super Numer, Unite Rech Pluridisciplinaire Informat & Math App, Nouakchott, Mauritania
[4] Ecole Super Polytech, Unite Rech Intelligence Artificielle, Nouakchott, Mauritania
关键词
Multi-project scheduling; Multi-skilled employees; Employee assignment; MIGP; Heuristics; Tabu search; LOCAL SEARCH ALGORITHM; TABU SEARCH; OPTIMIZATION ALGORITHM; STAFF ASSIGNMENT; CONSUMPTION; FORMULATION; MODEL;
D O I
10.1007/s11750-022-00633-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we address a multi-project scheduling and multi-skilled employees assignment problem with hard and soft constraints. The goal is to assign employees to project tasks in a way that minimizes the total weighted tardiness and the undesirable goal deviations. Employees are assigned to projects with fixed percentages of time, and they must complete all projects within the desired time horizon. Each project is broken down into a set of preemptive tasks with release and due dates, without explicit precedence constraints. Each task must be performed by a single employee owning several skills and an efficiency level per skill, i.e., the processing time of the task may be reduced according to the efficiency level of the employee assigned to this task. As specified later, the studied problem comes from an industrial case in an IT company. All the constraints and the goal to achieve have been discussed with the projects managers. For this problem, we present a mixed-integer goal programming (MIGP) formulation to produce an optimal schedule. Furthermore, a local search algorithm and a tabu search algorithm are proposed to tackle large-scale instances. We compare the performance of the heuristic algorithms against the corresponding MIGP formulation with simulated instances derived from real-world instances got from the partner company.
引用
下载
收藏
页码:194 / 235
页数:42
相关论文
共 50 条
  • [1] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [2] Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman
    Dauzere-Peres, Stephane
    Yugma, Claude
    Gallais, Cedric
    Pouzet, Juliette
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 69 - 114
  • [3] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Ghamginzadeh, Arman
    Najafi, Amir Abbas
    Khalilzadeh, Mohammad
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (02) : 518 - 534
  • [4] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Arman Ghamginzadeh
    Amir Abbas Najafi
    Mohammad Khalilzadeh
    International Journal of Fuzzy Systems, 2021, 23 : 518 - 534
  • [5] Research on the multi-project task scheduling under multi-resource constraints
    School of Mechanical and Electrical Engineering, Harbin Institute of Technology, Harbin 150001, China
    不详
    Harbin Gongye Daxue Xuebao, 2007, 7 (1045-1049):
  • [6] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Siemienski, Jedrzej J.
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
  • [7] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [8] Lower bounds for a multi-skill project scheduling problem
    Dhib, Cheikh
    Kooli, Anis
    Soukhal, Ameur
    Neron, Emmanuel
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 471 - 476
  • [9] Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem
    Skowronski, Marek E.
    Myszkowski, Pawel B.
    Adamski, Marcin
    Kwiatek, Pawel
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 153 - 158
  • [10] Methods to solve multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 85 - 88