Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty

被引:0
|
作者
Arman Ghamginzadeh
Amir Abbas Najafi
Mohammad Khalilzadeh
机构
[1] Islamic Azad University,Department of Industrial Engineering, Science and Research Branch
[2] K. N. Toosi University of Technology,Faculty of Industrial Engineering
来源
关键词
Multi-skill; Project scheduling; Fuzzy set; Time uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
One of the essential features of project management is the novelty of work and uncertainty in the estimation of activities which will, in turn, result in uncertainty in project scheduling. In this study, a multi-objective multi-skill project scheduling problem is examined in terms of fuzzy time with two main objectives including: minimizing the project's makespan and minimizing the total cost of labor allocation. Besides, a Multi-Objective Imperialist Competitive Algorithm (MOICA) is adopted to solve the problem. In order to evaluate the performance of the algorithm, the suggested algorithm is compared with the Non-d ominated Solutions Genetic Algorithm (NSGA-II) based on three indicators. Apart from these, the parameters were optimized using the Taguchi algorithm in order to optimize the performance of the proposed algorithm. The results indicate the good performance of the MOICA.
引用
收藏
页码:518 / 534
页数:16
相关论文
共 50 条
  • [1] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Ghamginzadeh, Arman
    Najafi, Amir Abbas
    Khalilzadeh, Mohammad
    [J]. INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (02) : 518 - 534
  • [2] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
    Tian, Yuan
    Xiong, Tifan
    Liu, Zhenyuan
    Mei, Yi
    Wan, Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 167
  • [3] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles
    Luo, Xu
    Guo, Shunsheng
    Du, Baigang
    Luo, Xinhao
    Guo, Jun
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [4] Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
    Laszczyk, Maciej
    Myszkowski, Pawel B.
    [J]. INFORMATION SCIENCES, 2019, 481 : 412 - 431
  • [5] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [6] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Siemienski, Jedrzej J.
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
  • [7] Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
    Zarei, Fateme
    Arashpour, Mehrdad
    Mirnezami, Seyed-Ali
    Shahabi-Shahamiri, Reza
    Ghasemi, Mohammad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 820 - 833
  • [8] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Podlodowski, Lukasz
    [J]. 2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 159 - 166
  • [9] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Sikora, Krzysztof
    [J]. PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 129 - 138
  • [10] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su, Zhixiong
    Gu, Huiming
    Qi, Jianxun
    Wei, Hanying
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365