GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem

被引:13
|
作者
Myszkowski, Pawel B. [1 ]
Siemienski, Jedrzej J. [1 ]
机构
[1] Wroclaw Univ Technol, Dept Computat Intelligence, Wroclaw, Poland
关键词
SIMULATED ANNEALING ALGORITHM;
D O I
10.1007/978-3-319-45243-2_37
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper describes an application of Greedy Randomized Adaptive Search Procedure (GRASP) in solving Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP). Proposed work proposes a specific greedy-based local search and schedule constructor specialised to MS-RCPSP. The GRASP is presented as the better option to classical heuristic but also as a faster and successful alternative to another metaheuristic. To compare results of GRASP to others approaches, various methods are proposed: methods of constructing scheduling based on the greedy algorithm, randomized greedy approach, and HAntCO. The research was performed using all instances of benchmark iMOPSE dataset and the results compared to best-known methods.
引用
收藏
页码:402 / 411
页数:10
相关论文
共 50 条
  • [1] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Sikora, Krzysztof
    PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 129 - 138
  • [2] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su Z.
    Gu H.
    Qi J.
    Wei H.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365
  • [3] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Podlodowski, Lukasz
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 159 - 166
  • [4] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [5] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Paweł B. Myszkowski
    Maciej Laszczyk
    Ivan Nikulin
    Marek Skowroński
    Soft Computing, 2019, 23 : 3397 - 3410
  • [6] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Kalinowski, Dawid
    PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
  • [7] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A.A.
    International Journal of Engineering, Transactions B: Applications, 2022, 35 (08):
  • [8] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Ghamginzadeh, Arman
    Najafi, Amir Abbas
    Khalilzadeh, Mohammad
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (02) : 518 - 534
  • [9] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Arman Ghamginzadeh
    Amir Abbas Najafi
    Mohammad Khalilzadeh
    International Journal of Fuzzy Systems, 2021, 23 : 518 - 534
  • [10] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A. A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (08): : 1579 - 1587