GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem

被引:13
|
作者
Myszkowski, Pawel B. [1 ]
Siemienski, Jedrzej J. [1 ]
机构
[1] Wroclaw Univ Technol, Dept Computat Intelligence, Wroclaw, Poland
关键词
SIMULATED ANNEALING ALGORITHM;
D O I
10.1007/978-3-319-45243-2_37
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper describes an application of Greedy Randomized Adaptive Search Procedure (GRASP) in solving Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP). Proposed work proposes a specific greedy-based local search and schedule constructor specialised to MS-RCPSP. The GRASP is presented as the better option to classical heuristic but also as a faster and successful alternative to another metaheuristic. To compare results of GRASP to others approaches, various methods are proposed: methods of constructing scheduling based on the greedy algorithm, randomized greedy approach, and HAntCO. The research was performed using all instances of benchmark iMOPSE dataset and the results compared to best-known methods.
引用
收藏
页码:402 / 411
页数:10
相关论文
共 50 条
  • [31] Constraint Programming Applied to the Multi-Skill Project Scheduling Problem
    Young, Kenneth D.
    Feydy, Thibaut
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING (CP 2017), 2017, 10416 : 308 - 317
  • [32] A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem
    Ghasemi, Mohammad
    Chakrabortty, Ripon K.
    Shahabi-Shahmiri, Reza
    Mirnezami, Seyed-Ali
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1090 - 1106
  • [33] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [34] Dynamic resource priority-based heuristics for multi-skill resource constrained project scheduling problem
    Hu Z.-T.
    Cui N.-F.
    Zhang Y.
    Hu X.-J.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (10): : 2553 - 2561
  • [35] Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
    Zarei, Fateme
    Arashpour, Mehrdad
    Mirnezami, Seyed-Ali
    Shahabi-Shahamiri, Reza
    Ghasemi, Mohammad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 820 - 833
  • [36] Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
    Akbar, Saeed
    Zubair, Muhammad
    Khan, Rizwan
    Ul Akbar, Ubaid
    Ullah, Rahmat
    Zheng, Zhonglong
    IEEE ACCESS, 2024, 12 : 29824 - 29836
  • [37] A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (01) : 321 - 363
  • [38] An Improved Tabu Search for Multi-skill Resource-Constrained Project Scheduling Problems Under Step-Deterioration
    Dai, Huafeng
    Cheng, Wenming
    Guo, Peng
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2018, 43 (06) : 3279 - 3290
  • [39] An Improved Tabu Search for Multi-skill Resource-Constrained Project Scheduling Problems Under Step-Deterioration
    Huafeng Dai
    Wenming Cheng
    Peng Guo
    Arabian Journal for Science and Engineering, 2018, 43 : 3279 - 3290
  • [40] Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks1
    Wang, Peng
    Lu, Shaojun
    Cheng, Hao
    Liu, Lin
    Pei, Feng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 44 (03) : 5275 - 5294