Multi-project scheduling problem under shared multi-skill resource constraints

被引:6
|
作者
Haroune, Meya [1 ,2 ,3 ]
Dhib, Cheikh [2 ,3 ]
Neron, Emmanuel [1 ]
Soukhal, Ameur [1 ]
Babou, Hafed Mohamed [2 ,4 ]
Nanne, Mohamedade Farouk [2 ]
机构
[1] Univ Tours, Lab Informat Fondamentale & Appl Tours LIFAT ROOT, CNRS, Tours, France
[2] Univ Nouakchott Al Aasriya, Unite Rech Calcul Sci Informat & Data Sci, Nouakchott, Mauritania
[3] Inst Super Numer, Unite Rech Pluridisciplinaire Informat & Math App, Nouakchott, Mauritania
[4] Ecole Super Polytech, Unite Rech Intelligence Artificielle, Nouakchott, Mauritania
关键词
Multi-project scheduling; Multi-skilled employees; Employee assignment; MIGP; Heuristics; Tabu search; LOCAL SEARCH ALGORITHM; TABU SEARCH; OPTIMIZATION ALGORITHM; STAFF ASSIGNMENT; CONSUMPTION; FORMULATION; MODEL;
D O I
10.1007/s11750-022-00633-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we address a multi-project scheduling and multi-skilled employees assignment problem with hard and soft constraints. The goal is to assign employees to project tasks in a way that minimizes the total weighted tardiness and the undesirable goal deviations. Employees are assigned to projects with fixed percentages of time, and they must complete all projects within the desired time horizon. Each project is broken down into a set of preemptive tasks with release and due dates, without explicit precedence constraints. Each task must be performed by a single employee owning several skills and an efficiency level per skill, i.e., the processing time of the task may be reduced according to the efficiency level of the employee assigned to this task. As specified later, the studied problem comes from an industrial case in an IT company. All the constraints and the goal to achieve have been discussed with the projects managers. For this problem, we present a mixed-integer goal programming (MIGP) formulation to produce an optimal schedule. Furthermore, a local search algorithm and a tabu search algorithm are proposed to tackle large-scale instances. We compare the performance of the heuristic algorithms against the corresponding MIGP formulation with simulated instances derived from real-world instances got from the partner company.
引用
下载
收藏
页码:194 / 235
页数:42
相关论文
共 50 条
  • [41] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [42] Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Huan-yu Zheng
    Ling Wang
    Xiao-long Zheng
    Soft Computing, 2017, 21 : 1537 - 1548
  • [43] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles
    Luo, Xu
    Guo, Shunsheng
    Du, Baigang
    Luo, Xinhao
    Guo, Jun
    APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [44] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Kalinowski, Dawid
    PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
  • [45] A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
    Lin, Jian
    Zhu, Lei
    Gao, Kaizhou
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 140
  • [46] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A.A.
    International Journal of Engineering, Transactions B: Applications, 2022, 35 (08):
  • [47] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548
  • [48] Investigation of benchmark dataset for many-objective Multi-Skill Resource Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    APPLIED SOFT COMPUTING, 2022, 127
  • [49] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [50] Modeling frameworks for the multi-skill resource-constrained project scheduling problem: a theoretical and empirical comparison
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (03) : 946 - 967