Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem

被引:3
|
作者
Huan-yu Zheng
Ling Wang
Xiao-long Zheng
机构
[1] Tsinghua University,Tsinghua National Laboratory for Information Science and Technology (TNList), Department of Automation
来源
Soft Computing | 2017年 / 21卷
关键词
Teaching–learning-based optimization; Project scheduling; Multi-skill; Balanced resource rule; Reinforcement phase;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a teaching–learning-based optimization algorithm (TLBO) is proposed to solve the multi-skill resource constrained project scheduling problem (MS-RCPSP) with makespan minimization criterion. A task-resource list-based encoding scheme is presented by combining the task list and the resource list, and a left-shift decoding scheme is developed to generate feasible schedules. To achieve satisfactory performances, the balance between global exploration and local exploitation is stressed in designing the TLBO algorithm. At the initialization stage, a balanced resource rule is proposed to generate the initial resource lists, and multiple task list rules are adopted in a hybrid way to initialize the task lists. At the teacher phase and the student phase, the two-point crossover and the resource-based local search are utilized to generate the promising task-resource lists. Moreover, a reinforcement phase is incorporated into the original TLBO with both the permutation-based and the resource-based local search strategies as an additional phase to enhance the local intensification capability. To investigate the influence of parameter setting on the TLBO, numerical tests based on Taguchi method of design of experiment are carried out. In addition, the effectiveness of the proposed balanced resource rule is shown by statistical comparisons with the random resource rule. Computational comparisons between TLBO and the existing algorithm also demonstrate the effectiveness and efficiency of the proposed TLBO in solving the MS-RCPSP.
引用
收藏
页码:1537 / 1548
页数:11
相关论文
共 50 条
  • [1] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    [J]. SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548
  • [2] An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem
    Joshi, Dheeraj
    Mittal, M. L.
    Sharma, Milind Kumar
    Kumar, Manish
    [J]. JOURNAL OF MODELLING IN MANAGEMENT, 2019, 14 (04) : 1064 - 1087
  • [3] Reinforcement learning-based algorithm for multi-skill project scheduling problem
    Hu, Zhen-Tao
    Cui, Nan-Fang
    Hu, Xue-Jun
    Lei, Xiao-Qi
    [J]. Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (03): : 502 - 511
  • [4] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    [J]. APPLIED SOFT COMPUTING, 2019, 85
  • [5] A knowledge-based fruit fly optimization algorithm for multi-skill resource-constrained project scheduling problem
    Zheng Xiaolong
    Wang Ling
    Zheng Huanyu
    [J]. 2015 34TH CHINESE CONTROL CONFERENCE (CCC), 2015, : 2615 - 2620
  • [6] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [7] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    [J]. SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [8] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Paweł B. Myszkowski
    Maciej Laszczyk
    Ivan Nikulin
    Marek Skowroński
    [J]. Soft Computing, 2019, 23 : 3397 - 3410
  • [9] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Peng, Jun Long
    Liu, Xiao
    Peng, Chao
    Shao, Yu
    [J]. SCIENTIFIC REPORTS, 2023, 13 (01)
  • [10] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Jun Long Peng
    Xiao Liu
    Chao Peng
    Yu Shao
    [J]. Scientific Reports, 13