An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem

被引:6
|
作者
Joshi, Dheeraj [1 ,2 ]
Mittal, M. L. [2 ]
Sharma, Milind Kumar [3 ]
Kumar, Manish [2 ]
机构
[1] Swami Keshvanand Inst Technol Management & Gramot, Mech Engn, Jaipur, Rajasthan, India
[2] Malaviya Natl Inst Technol, Mech Engn, Jaipur, Rajasthan, India
[3] Jai Narain Vyas Univ, MBM Engn Coll, Prod & Ind Engn, Jodhpur, Rajasthan, India
关键词
Project management; Algorithms; Scheduling; Heuristics; Optimization; GENETIC ALGORITHM; PERFORMANCE; ALLOCATION; SELECTION;
D O I
10.1108/JM2-07-2018-0108
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to consider one of the recent and practical extensions of the resource-constrained project scheduling problem (RCPSP) termed as the multi-skill resource-constrained project scheduling problem (MSRCPSP) for investigation. The objective is the minimization of the makespan or total project duration. Design/methodology/approach To solve this complex problem, the authors propose a teaching-learning-based optimization (TLBO) algorithm in which self-study and examination have been used as additional features to enhance its exploration and exploitation capabilities. An activity list-based encoding scheme has been modified to include the resource assignment information because of the multi-skill nature of the algorithm. In addition, a genetic algorithm (GA) is also developed in this work for the purpose of comparisons. The computational experiments are performed on 216 test instances with varying complexity and characteristics generated for the purpose. Findings The results obtained after computations show that the TLBO has performed significantly better than GA in terms of average percentage deviation from the critical path-based lower bound for different combinations of three parameters, namely, skill factor, network complexity and modified resource strength. Research limitations/implications - The modified TLBO proposed in this paper can be conveniently applied to any product or service organization wherein human resources are involved in executing project activities. Practical implications - The developed model can suitably handle resource allocation problems faced in real-life large-sized projects usually administered in software development companies, consultancy firms, R&D-based organizations, maintenance firms, big construction houses, etc. wherein human resources are involved. Originality/value The current work aims to propose an effective metaheuristic for a more realistic version of MSRCPSP, in which resource requirements of activities may be more than one. Moreover, to enhance the exploration and exploitation capabilities of the original TLBO, the authors use two additional concepts, namely, self-study and examination in the search process.
引用
收藏
页码:1064 / 1087
页数:24
相关论文
共 50 条
  • [1] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    [J]. SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548
  • [2] A Teaching-Learning-Based Optimization Algorithm for the Resource-Constrained Project Scheduling Problem
    Joshi, Dheeraj
    Mittal, M. L.
    Kumar, Manish
    [J]. HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 1101 - 1109
  • [3] Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Huan-yu Zheng
    Ling Wang
    Xiao-long Zheng
    [J]. Soft Computing, 2017, 21 : 1537 - 1548
  • [4] A knowledge-based fruit fly optimization algorithm for multi-skill resource-constrained project scheduling problem
    Zheng Xiaolong
    Wang Ling
    Zheng Huanyu
    [J]. 2015 34TH CHINESE CONTROL CONFERENCE (CCC), 2015, : 2615 - 2620
  • [5] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    [J]. SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [6] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Paweł B. Myszkowski
    Maciej Laszczyk
    Ivan Nikulin
    Marek Skowroński
    [J]. Soft Computing, 2019, 23 : 3397 - 3410
  • [7] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Siemienski, Jedrzej J.
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
  • [8] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Jun Long Peng
    Xiao Liu
    Chao Peng
    Yu Shao
    [J]. Scientific Reports, 13
  • [9] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Peng, Jun Long
    Liu, Xiao
    Peng, Chao
    Shao, Yu
    [J]. SCIENTIFIC REPORTS, 2023, 13 (01)
  • [10] A teaching-learning-based optimization algorithm for multi-objective resource constrained project scheduling problem
    Wang, Ling
    Zheng, Huan-Yu
    [J]. Kongzhi yu Juece/Control and Decision, 2015, 30 (10): : 1868 - 1872