Multi-project scheduling problem under shared multi-skill resource constraints

被引:6
|
作者
Haroune, Meya [1 ,2 ,3 ]
Dhib, Cheikh [2 ,3 ]
Neron, Emmanuel [1 ]
Soukhal, Ameur [1 ]
Babou, Hafed Mohamed [2 ,4 ]
Nanne, Mohamedade Farouk [2 ]
机构
[1] Univ Tours, Lab Informat Fondamentale & Appl Tours LIFAT ROOT, CNRS, Tours, France
[2] Univ Nouakchott Al Aasriya, Unite Rech Calcul Sci Informat & Data Sci, Nouakchott, Mauritania
[3] Inst Super Numer, Unite Rech Pluridisciplinaire Informat & Math App, Nouakchott, Mauritania
[4] Ecole Super Polytech, Unite Rech Intelligence Artificielle, Nouakchott, Mauritania
关键词
Multi-project scheduling; Multi-skilled employees; Employee assignment; MIGP; Heuristics; Tabu search; LOCAL SEARCH ALGORITHM; TABU SEARCH; OPTIMIZATION ALGORITHM; STAFF ASSIGNMENT; CONSUMPTION; FORMULATION; MODEL;
D O I
10.1007/s11750-022-00633-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we address a multi-project scheduling and multi-skilled employees assignment problem with hard and soft constraints. The goal is to assign employees to project tasks in a way that minimizes the total weighted tardiness and the undesirable goal deviations. Employees are assigned to projects with fixed percentages of time, and they must complete all projects within the desired time horizon. Each project is broken down into a set of preemptive tasks with release and due dates, without explicit precedence constraints. Each task must be performed by a single employee owning several skills and an efficiency level per skill, i.e., the processing time of the task may be reduced according to the efficiency level of the employee assigned to this task. As specified later, the studied problem comes from an industrial case in an IT company. All the constraints and the goal to achieve have been discussed with the projects managers. For this problem, we present a mixed-integer goal programming (MIGP) formulation to produce an optimal schedule. Furthermore, a local search algorithm and a tabu search algorithm are proposed to tackle large-scale instances. We compare the performance of the heuristic algorithms against the corresponding MIGP formulation with simulated instances derived from real-world instances got from the partner company.
引用
下载
收藏
页码:194 / 235
页数:42
相关论文
共 50 条
  • [21] Dynamic resource priority-based heuristics for multi-skill resource constrained project scheduling problem
    Hu Z.-T.
    Cui N.-F.
    Zhang Y.
    Hu X.-J.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (10): : 2553 - 2561
  • [22] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
    Tian, Yuan
    Xiong, Tifan
    Liu, Zhenyuan
    Mei, Yi
    Wan, Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 167
  • [23] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    APPLIED SOFT COMPUTING, 2019, 85
  • [24] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [25] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Paweł B. Myszkowski
    Maciej Laszczyk
    Ivan Nikulin
    Marek Skowroński
    Soft Computing, 2019, 23 : 3397 - 3410
  • [26] A Heuristic Method for the Multi-skill Project Scheduling Problem with Partial Preemption
    Polo-Mejia, Oliver
    Artigues, Christian
    Lopez, Pierre
    ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 111 - 120
  • [27] Branch-and-price approach for the multi-skill project scheduling problem
    Carlos Montoya
    Odile Bellenguez-Morineau
    Eric Pinson
    David Rivreau
    Optimization Letters, 2014, 8 : 1721 - 1734
  • [28] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [29] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [30] Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
    Akbar, Saeed
    Zubair, Muhammad
    Khan, Rizwan
    Ul Akbar, Ubaid
    Ullah, Rahmat
    Zheng, Zhonglong
    IEEE ACCESS, 2024, 12 : 29824 - 29836