Multi-project scheduling problem under shared multi-skill resource constraints

被引:6
|
作者
Haroune, Meya [1 ,2 ,3 ]
Dhib, Cheikh [2 ,3 ]
Neron, Emmanuel [1 ]
Soukhal, Ameur [1 ]
Babou, Hafed Mohamed [2 ,4 ]
Nanne, Mohamedade Farouk [2 ]
机构
[1] Univ Tours, Lab Informat Fondamentale & Appl Tours LIFAT ROOT, CNRS, Tours, France
[2] Univ Nouakchott Al Aasriya, Unite Rech Calcul Sci Informat & Data Sci, Nouakchott, Mauritania
[3] Inst Super Numer, Unite Rech Pluridisciplinaire Informat & Math App, Nouakchott, Mauritania
[4] Ecole Super Polytech, Unite Rech Intelligence Artificielle, Nouakchott, Mauritania
关键词
Multi-project scheduling; Multi-skilled employees; Employee assignment; MIGP; Heuristics; Tabu search; LOCAL SEARCH ALGORITHM; TABU SEARCH; OPTIMIZATION ALGORITHM; STAFF ASSIGNMENT; CONSUMPTION; FORMULATION; MODEL;
D O I
10.1007/s11750-022-00633-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we address a multi-project scheduling and multi-skilled employees assignment problem with hard and soft constraints. The goal is to assign employees to project tasks in a way that minimizes the total weighted tardiness and the undesirable goal deviations. Employees are assigned to projects with fixed percentages of time, and they must complete all projects within the desired time horizon. Each project is broken down into a set of preemptive tasks with release and due dates, without explicit precedence constraints. Each task must be performed by a single employee owning several skills and an efficiency level per skill, i.e., the processing time of the task may be reduced according to the efficiency level of the employee assigned to this task. As specified later, the studied problem comes from an industrial case in an IT company. All the constraints and the goal to achieve have been discussed with the projects managers. For this problem, we present a mixed-integer goal programming (MIGP) formulation to produce an optimal schedule. Furthermore, a local search algorithm and a tabu search algorithm are proposed to tackle large-scale instances. We compare the performance of the heuristic algorithms against the corresponding MIGP formulation with simulated instances derived from real-world instances got from the partner company.
引用
下载
收藏
页码:194 / 235
页数:42
相关论文
共 50 条
  • [31] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [32] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Peng, Jun Long
    Liu, Xiao
    Peng, Chao
    Shao, Yu
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [33] Human Resource Scheduling Model and Algorithm with Time Windows and Multi-Skill Constraints
    Zuo, Zhiping
    Li, Yanhui
    Fu, Jing
    Wu, Jianlin
    MATHEMATICS, 2019, 7 (07)
  • [34] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Jun Long Peng
    Xiao Liu
    Chao Peng
    Yu Shao
    Scientific Reports, 13
  • [35] Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
    Laszczyk, Maciej
    Myszkowski, Pawel B.
    INFORMATION SCIENCES, 2019, 481 : 412 - 431
  • [36] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [37] MULTI-PROJECT SCHEDULING WITH RESOURCE CONSTRAINS
    HIRAOKA, T
    BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1980, 23 (185): : 1929 - 1936
  • [38] Multi-skill project scheduling with skill evolution and cooperation effectiveness
    Li, Qian
    Sun, Qinshan
    Tao, Sha
    Gao, Xinglin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 2023 - 2045
  • [39] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [40] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556