共 50 条
- [1] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
- [3] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem [J]. PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
- [4] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem [J]. Soft Computing, 2015, 19 : 3599 - 3619
- [6] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem [J]. 2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 159 - 166
- [7] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem [J]. PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 129 - 138
- [8] New algorithms for a partial multi-skill resource-constrained project scheduling problem [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365
- [9] Novel Feedback-based Operators in Solving Multi-skill Resource-Constrained Project Scheduling Problem [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 296 - 301