Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem

被引:0
|
作者
Paweł B. Myszkowski
Marek E. Skowroński
Łukasz P. Olech
Krzysztof Oślizło
机构
[1] Wroclaw University of Technology,Department of Artificial Intelligence
来源
Soft Computing | 2015年 / 19卷
关键词
Ant colony optimization; Project scheduling problem ; Metaheuristics; Hybrid ACO; Multi-objective optimization; Benchmark dataset;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, hybrid ant colony optimization (HAntCO) approach in solving multi-skill resource-constrained project scheduling problem (MS-RCPSP) has been presented. We have proposed hybrid approach that links classical heuristic priority rules for project scheduling with ant colony optimization (ACO). Furthermore, a novel approach for updating pheromone value has been proposed based on both the best and worst solutions stored by ants. The objective of this paper is to research the usability and robustness of ACO and its hybrids with priority rules in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances based on real-world ones. We published those instances that can be used as a benchmark. Presented results show that ACO-based hybrid method is an efficient approach. More directed search process by hybrids makes this approach more stable and provides mostly better results than classical ACO.
引用
收藏
页码:3599 / 3619
页数:20
相关论文
共 50 条
  • [1] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    [J]. SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [2] Hybrid ant colony optimization for the resource-constrained project scheduling problem
    Linyi Deng1
    2. State Key Laboratory of Structural Analysis for Industrial Equipment
    [J]. Journal of Systems Engineering and Electronics, 2010, 21 (01) : 67 - 71
  • [3] Hybrid ant colony optimization for the resource-constrained project scheduling problem
    Deng, Linyi
    Lin, Yan
    Chen, Ming
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2010, 21 (01) : 67 - 71
  • [4] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    [J]. SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [5] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Paweł B. Myszkowski
    Maciej Laszczyk
    Ivan Nikulin
    Marek Skowroński
    [J]. Soft Computing, 2019, 23 : 3397 - 3410
  • [6] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Siemienski, Jedrzej J.
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
  • [7] Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Olech, Lukasz P.
    Laszczyk, Maciej
    Skowronski, Marek E.
    [J]. APPLIED SOFT COMPUTING, 2018, 62 : 1 - 14
  • [8] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Kalinowski, Dawid
    [J]. PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
  • [9] Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman
    Dauzere-Peres, Stephane
    Yugma, Claude
    Gallais, Cedric
    Pouzet, Juliette
    [J]. ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 69 - 114
  • [10] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su, Zhixiong
    Gu, Huiming
    Qi, Jianxun
    Wei, Hanying
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365