Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem

被引:0
|
作者
Paweł B. Myszkowski
Marek E. Skowroński
Łukasz P. Olech
Krzysztof Oślizło
机构
[1] Wroclaw University of Technology,Department of Artificial Intelligence
来源
Soft Computing | 2015年 / 19卷
关键词
Ant colony optimization; Project scheduling problem ; Metaheuristics; Hybrid ACO; Multi-objective optimization; Benchmark dataset;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, hybrid ant colony optimization (HAntCO) approach in solving multi-skill resource-constrained project scheduling problem (MS-RCPSP) has been presented. We have proposed hybrid approach that links classical heuristic priority rules for project scheduling with ant colony optimization (ACO). Furthermore, a novel approach for updating pheromone value has been proposed based on both the best and worst solutions stored by ants. The objective of this paper is to research the usability and robustness of ACO and its hybrids with priority rules in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances based on real-world ones. We published those instances that can be used as a benchmark. Presented results show that ACO-based hybrid method is an efficient approach. More directed search process by hybrids makes this approach more stable and provides mostly better results than classical ACO.
引用
收藏
页码:3599 / 3619
页数:20
相关论文
共 50 条
  • [41] A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 88 : 157 - 169
  • [42] Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Huan-yu Zheng
    Ling Wang
    Xiao-long Zheng
    [J]. Soft Computing, 2017, 21 : 1537 - 1548
  • [43] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    [J]. SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548
  • [44] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    [J]. APPLIED SOFT COMPUTING, 2019, 85
  • [45] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    [J]. Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651
  • [46] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [47] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    [J]. SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [48] Using an Enhanced Ant Colony System to Solve Resource-Constrained Project Scheduling Problem
    Chen, Ruey-Maw
    Lo, Shih-Tang
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (11): : 75 - 84
  • [49] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    [J]. OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [50] Improved Ant Colony Algorithm for Solving Multi-modal Resource Constrained Project Scheduling Problem
    Chen, Jie
    Hau, Wenqian
    Dong, Yixi
    [J]. 2022 INTERNATIONAL CONFERENCE ON BIG DATA, INFORMATION AND COMPUTER NETWORK (BDICN 2022), 2022, : 6 - 11