A heuristic solution framework for the resource-constrained multi-aircraft scheduling problem with transfer of resources and aircraft

被引:1
|
作者
Su, Xichao [1 ]
Cui, Rongwei [1 ]
Li, Changjiu [1 ]
Han, Wei [1 ]
Liu, Jie [2 ]
机构
[1] Naval Aviat Univ, Yantai 264001, Shandong, Peoples R China
[2] Acad Mil Sci, War Res Inst, Beijing 100850, Peoples R China
关键词
Project scheduling; Heuristics; Flight deck operation; Carrier aircraft; GENETIC ALGORITHM; RULES;
D O I
10.1016/j.eswa.2023.120430
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Efficient and feasible flight deck operation scheduling plan is of great significance for improving the sortie rate of carrier aircraft. Oxygen filling, fueling, and other operations of each carrier aircraft are executed in the pre-flight preparation stage. Different personnel, support equipments, and supply resources, are required while different operations are being executed. To date, most approaches proposed in the literature are based on the unrealistic assumption that the transfer process of carrier aircraft can be ignored. To close this gap, the resource-constrained multi-aircraft scheduling problem on the flight deck is examined in this study. The main contributions of the study are as follows. First, by considering the transfer process of aircraft on the flight deck operations, the model formulation of resource-constrained multi-aircraft scheduling problem is established. Second, the parallel and serial scheduling framework are proposed, where parking spot priority rules and resource allocation rules are presented to select the most suitable resources. Third, a modified genetic programming algorithm is presented for obtaining efficient activity priority rules. Fourth, the well-performed scheduling framework, priority rules, and allocation rules are selected by conducting computational experiments. Furthermore, experiment results show that the parallel scheduling framework outperforms the serial framework in most experiments (average out -performance is 10.19%), and the parking spot priority rules slightly affect the serial scheduling framework.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    OR SPEKTRUM, 2001, 23 (03) : 335 - 357
  • [22] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [23] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [24] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [25] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
  • [26] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [27] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [28] Multiple objective solution approaches for aircraft rerouting under the disruption of multi-aircraft
    Hu, Yuzhen
    Liao, Hong
    Zhang, Song
    Song, Yan
    EXPERT SYSTEMS WITH APPLICATIONS, 2017, 83 : 283 - 299
  • [29] The electromagnetism meta-heuristic applied to the resource-constrained project scheduling problem
    Debels, Dieter
    Vanhoucke, Mario
    ARTIFICIAL EVOLUTION, 2006, 3871 : 259 - 270
  • [30] Meta-heuristic Techniques to Solve Resource-Constrained Project Scheduling Problem
    Roy, Bidisha
    Sen, Asim Kumar
    INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATIONS, VOL 2, 2019, 56 : 93 - 99