A heuristic solution framework for the resource-constrained multi-aircraft scheduling problem with transfer of resources and aircraft

被引:1
|
作者
Su, Xichao [1 ]
Cui, Rongwei [1 ]
Li, Changjiu [1 ]
Han, Wei [1 ]
Liu, Jie [2 ]
机构
[1] Naval Aviat Univ, Yantai 264001, Shandong, Peoples R China
[2] Acad Mil Sci, War Res Inst, Beijing 100850, Peoples R China
关键词
Project scheduling; Heuristics; Flight deck operation; Carrier aircraft; GENETIC ALGORITHM; RULES;
D O I
10.1016/j.eswa.2023.120430
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Efficient and feasible flight deck operation scheduling plan is of great significance for improving the sortie rate of carrier aircraft. Oxygen filling, fueling, and other operations of each carrier aircraft are executed in the pre-flight preparation stage. Different personnel, support equipments, and supply resources, are required while different operations are being executed. To date, most approaches proposed in the literature are based on the unrealistic assumption that the transfer process of carrier aircraft can be ignored. To close this gap, the resource-constrained multi-aircraft scheduling problem on the flight deck is examined in this study. The main contributions of the study are as follows. First, by considering the transfer process of aircraft on the flight deck operations, the model formulation of resource-constrained multi-aircraft scheduling problem is established. Second, the parallel and serial scheduling framework are proposed, where parking spot priority rules and resource allocation rules are presented to select the most suitable resources. Third, a modified genetic programming algorithm is presented for obtaining efficient activity priority rules. Fourth, the well-performed scheduling framework, priority rules, and allocation rules are selected by conducting computational experiments. Furthermore, experiment results show that the parallel scheduling framework outperforms the serial framework in most experiments (average out -performance is 10.19%), and the parking spot priority rules slightly affect the serial scheduling framework.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [42] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Gafarov, Evgeny R.
    Lazarev, Alexander A.
    Werner, Frank
    ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 115 - 130
  • [43] RETRACTED: A Heuristic Genetic Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problem (Retracted Article)
    Li Zheng
    Qin Jinlei
    Zhang Changming
    ICCSIT 2010 - 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 3, 2010, : 582 - 585
  • [44] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Evgeny R. Gafarov
    Alexander A. Lazarev
    Frank Werner
    Annals of Operations Research, 2014, 213 : 115 - 130
  • [45] A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic
    Zhang, Jingwen
    Li, Lubo
    Demeulemeester, Erik
    Zhang, Haohua
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 943 - 966
  • [46] Heuristic algorithm for the resource-constrained scheduling problem during high-level synthesis
    Wu, Y. -H.
    Yu, C. -J.
    Wang, S. -D.
    IET COMPUTERS AND DIGITAL TECHNIQUES, 2009, 3 (01): : 43 - 51
  • [47] Resource-constrained project scheduling problem with multi-factor disruptions
    College of Computer Science and Information Engineering, Zhejiang Gongshang University, Hangzhou 310018, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2012, 11 (2409-2418):
  • [48] Heuristic Particle Swarm Optimization for Resource-Constrained Project Scheduling Problem in Chemical Industries
    Tang, Qi
    Tang, Lixin
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1475 - 1480
  • [49] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [50] An adaptive genetic algorithm for demand-driven and resource-constrained project scheduling in aircraft assembly
    Shan, Siqing
    Hu, Zhongjun
    Liu, Zhilian
    Shi, Jihong
    Wang, Li
    Bi, Zhuming
    INFORMATION TECHNOLOGY & MANAGEMENT, 2017, 18 (01): : 41 - 53