A heuristic solution framework for the resource-constrained multi-aircraft scheduling problem with transfer of resources and aircraft

被引:1
|
作者
Su, Xichao [1 ]
Cui, Rongwei [1 ]
Li, Changjiu [1 ]
Han, Wei [1 ]
Liu, Jie [2 ]
机构
[1] Naval Aviat Univ, Yantai 264001, Shandong, Peoples R China
[2] Acad Mil Sci, War Res Inst, Beijing 100850, Peoples R China
关键词
Project scheduling; Heuristics; Flight deck operation; Carrier aircraft; GENETIC ALGORITHM; RULES;
D O I
10.1016/j.eswa.2023.120430
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Efficient and feasible flight deck operation scheduling plan is of great significance for improving the sortie rate of carrier aircraft. Oxygen filling, fueling, and other operations of each carrier aircraft are executed in the pre-flight preparation stage. Different personnel, support equipments, and supply resources, are required while different operations are being executed. To date, most approaches proposed in the literature are based on the unrealistic assumption that the transfer process of carrier aircraft can be ignored. To close this gap, the resource-constrained multi-aircraft scheduling problem on the flight deck is examined in this study. The main contributions of the study are as follows. First, by considering the transfer process of aircraft on the flight deck operations, the model formulation of resource-constrained multi-aircraft scheduling problem is established. Second, the parallel and serial scheduling framework are proposed, where parking spot priority rules and resource allocation rules are presented to select the most suitable resources. Third, a modified genetic programming algorithm is presented for obtaining efficient activity priority rules. Fourth, the well-performed scheduling framework, priority rules, and allocation rules are selected by conducting computational experiments. Furthermore, experiment results show that the parallel scheduling framework outperforms the serial framework in most experiments (average out -performance is 10.19%), and the parking spot priority rules slightly affect the serial scheduling framework.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] AN EXPERT-SYSTEM USING AN EXCHANGE HEURISTIC FOR THE RESOURCE-CONSTRAINED SCHEDULING PROBLEM
    ZONG, YP
    YANG, TY
    IGNIZIO, JP
    EXPERT SYSTEMS WITH APPLICATIONS, 1993, 6 (03) : 327 - 348
  • [32] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [33] SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BOCTOR, FF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) : 3 - 13
  • [34] RESOURCE-CONSTRAINED JOB SCHEDULING WITH RECYCLABLE RESOURCES
    SHEWCHUK, JP
    CHANG, TC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 364 - 375
  • [35] A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    MATHEMATICS OF OPERATIONS RESEARCH, 2022, 47 (04) : 3156 - 3183
  • [36] An adaptive memory programming framework for the resource-constrained project scheduling problem
    Paraskevopoulos, Dimitris C.
    Tarantilis, Christos D.
    Ioannou, George
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4938 - 4956
  • [37] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [38] Heuristic scheduling of resource-constrained projects with cash flows
    Padman, R
    SmithDaniels, DE
    SmithDaniels, VL
    NAVAL RESEARCH LOGISTICS, 1997, 44 (04) : 365 - 381
  • [39] Heuristic scheduling of resource-constrained, multiplemode and repetitive projects
    Zhang, Hong
    Li, Heng
    Tam, C. M.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (02) : 159 - 169
  • [40] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428