共 50 条
- [1] The proactive and reactive resource-constrained project scheduling problem [J]. Journal of Scheduling, 2019, 22 : 211 - 237
- [3] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
- [5] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time [J]. Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44):
- [9] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem [J]. Annals of Operations Research, 2019, 274 : 187 - 210
- [10] Flexible resource-constrained resource leveling project scheduling problem [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976