共 50 条
- [1] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
- [2] Resource-constrained project scheduling problem with reworking [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
- [7] Approximate solution of a resource-constrained scheduling problem [J]. Journal of Heuristics, 2009, 15 : 1 - 17
- [10] Flexible resource-constrained resource leveling project scheduling problem [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976