Approximate solution of a resource-constrained scheduling problem

被引:5
|
作者
Sirdey, Renaud [1 ,2 ]
Carlier, Jacques [2 ]
Nace, Dritan [2 ]
机构
[1] Nortel GSM Access R&D, Serv Architecture BSC, F-78928 Yvelines 09, France
[2] Univ Technol Compiegne, CNRS, UMR Heudiasyc, Ctr Rech Royallieu, F-60205 Compiegne, France
关键词
Combinatorial optimization; Scheduling; Simulated annealing; Distributed systems; OR in telecommunications; OPTIMIZATION; ALGORITHM;
D O I
10.1007/s10732-007-9052-0
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper is devoted to the approximate solution of a strongly NP-hard resource-constrained scheduling problem which arises in relation to the operability of certain high availability real time distributed systems. We present an algorithm based on the simulated annealing metaheuristic and, building on previous research on exact solution methods, extensive computational results demonstrating its practical ability to produce acceptable solutions, in a precisely defined sense. Additionally, our experiments are in remarkable agreement with certain theoretical properties of our simulated annealing scheme. The paper concludes with a short discussion on further research.
引用
收藏
页码:1 / 17
页数:17
相关论文
共 50 条
  • [1] Approximate solution of a resource-constrained scheduling problem
    Renaud Sirdey
    Jacques Carlier
    Dritan Nace
    [J]. Journal of Heuristics, 2009, 15 : 1 - 17
  • [2] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    [J]. International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [3] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [4] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [5] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    [J]. IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [6] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 153
  • [7] Comparison of Heuristic Priority Rules in the Solution of the Resource-Constrained Project Scheduling Problem
    Turkakin, Osman Hurol
    Arditi, David
    Manisali, Ekrem
    [J]. SUSTAINABILITY, 2021, 13 (17)
  • [8] An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 334 - 348
  • [9] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [10] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976