A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

被引:209
|
作者
OZDAMAR, L [1 ]
ULUSOY, G [1 ]
机构
[1] BOGAZICI UNIV,DEPT IND ENGN,ISTANBUL 80815,TURKEY
关键词
D O I
10.1080/07408179508936773
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, research on the resource-constrained project scheduling problem is classified according to specified objectives and constraints. Each classified area is extensively surveyed, and special emphasis is given to trends in recent research. Specific papers involving nonrenewable resource constraints and time/cost-based objectives are discussed in detail because they present models that are close representations of real-world problems. The difficulty of solving such complex models by optimization techniques is noted. For the purposes of this survey, a set of 78 optimally solved test problems from the literature and a second set of 110 benchmark problems have been subjected to analysis with some well-known dispatching rules and a scheduling algorithm that consists of a decision-making process utilizing the problem constraints as a base of selection. The computational results are reported and discussed in the text. Constructive scheduling algorithms that are directly based on the problem constraints and whose performances are independent of problem characteristics are identified as a promising area for future research.
引用
收藏
页码:574 / 586
页数:13
相关论文
共 50 条
  • [1] A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
    Pellerin, Robert
    Perrier, Nathalie
    Berthaut, Francois
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 280 (02) : 395 - 416
  • [2] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [3] A survey of variants and extensions of the resource-constrained project scheduling problem
    Hartmann, Soenke
    Briskorn, Dirk
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 1 - 14
  • [4] Resource-constrained project scheduling problem with reworking
    Liao, Yina
    Lu, Zhiqiang
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [5] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [6] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 153
  • [7] An updated survey of variants and extensions of the resource-constrained project scheduling problem *
    Hartmann, Sonke
    Briskorn, Dirk
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (01) : 1 - 14
  • [8] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [9] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [10] Resource-constrained project scheduling: A survey of recent developments
    Herroelen, W
    De Reyck, B
    Demeulemeester, E
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (04) : 279 - 302