Resource-constrained project scheduling problem with uncertain durations and renewable resources

被引:0
|
作者
Weimin Ma
Yangyang Che
Hu Huang
Hua Ke
机构
[1] Tongji University,School of Economics and Management
关键词
Resource-constrained project scheduling; Uncertain duration; Genetic algorithm; Uncertainty theory; Renewable resource;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained project scheduling problem is to make a schedule for minimization of the makespan subject to precedence and resource constraints. In this paper, we consider an uncertain resource-constrained project scheduling problem (URCPSP) in which the activity durations, with no historical data generally, are estimated by experts. In order to deal with these estimations, an uncertainty-theory-based project scheduling model is proposed. Furthermore, a genetic algorithm integrating a 99-method based uncertain simulation is designed to search the quasi-optimal schedule. Numerical examples are also provided to illustrate the effectiveness of the model and the algorithm.
引用
收藏
页码:613 / 621
页数:8
相关论文
共 50 条
  • [1] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    [J]. INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [2] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [3] Robustifying the resource-constrained project scheduling against uncertain durations
    Fu, Fang
    Liu, Qi
    Yu, Guodong
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [4] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
    Wang, Wei
    Shou, Yongyi
    [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
  • [5] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Christian Artigues
    Roel Leus
    Fabrice Talla Nobibon
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
  • [6] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [7] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [8] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Leus, R.
    Artigues, C.
    Nobibon, F. Talla
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
  • [9] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [10] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi E.
    Aghaie A.
    Najafi A.A.
    [J]. Scientia Iranica, 2020, 27 (1 E) : 361 - 376