共 50 条
- [1] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
- [2] Robust optimization for resource-constrained project scheduling with uncertain activity durations [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
- [4] Robust optimization for resource-constrained project scheduling with uncertain activity durations [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
- [7] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [9] Resource-constrained project scheduling problem with uncertain durations and renewable resources [J]. International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
- [10] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457