An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations

被引:90
|
作者
Bruni, M. E. [1 ]
Pugliese, L. Di Puglia [1 ]
Beraldi, P. [1 ]
Guerriero, F. [1 ]
机构
[1] Univ Calabria, Dept Mech Energy & Management Engn, I-87036 Arcavacata Di Rende, Italy
关键词
Project scheduling; Resource constraints; Robust optimization; Benders decomposition; TABU SEARCH; CONSTRUCTION; STRATEGIES; STABILITY; PROGRAMS; DUALITY;
D O I
10.1016/j.omega.2016.09.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed to derive the resource allocation decisions that minimize the worst-case makespan, under general polyhedral uncertainty sets. The properties of the model are analyzed, assuming that the activity durations are subject to interval uncertainty where the level of robustness is controlled by a protection factor related to the risk aversion of the decision maker. A general decomposition approach is proposed to solve the robust counterpart of the resource-constrained project scheduling problem, further tailored to address the uncertainty set with the protection factor. An extensive computational study is presented on benchmark instances adapted from the PSPLIB. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:66 / 84
页数:19
相关论文
共 50 条
  • [41] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [42] A linear-discrete scheduling model for the resource-constrained project scheduling problem
    Bonnal, Pierre
    Gourc, Didier
    Hameri, Ari-Pekka
    Lacoste, Germain
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) : 797 - 814
  • [43] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [44] Activity list representation for a generalization of the resource-constrained project scheduling problem
    Moumene, Khaled
    Ferland, Jacques A.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (01) : 46 - 54
  • [45] An Effective Multi-Objective EDA for Robust Resource Constrained Project Scheduling with Uncertain Durations
    Hao, Xinchang
    Lin, Lin
    Gen, Mitsuo
    [J]. COMPLEX ADAPTIVE SYSTEMS, 2014, 36 : 571 - +
  • [46] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    [J]. KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [47] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [48] Robust scheduling optimization for resource-constrained project based on random duration of activities
    [J]. He, Z.-W. (zhengwenhe@mail.xjtu.edu.cn), 2013, Systems Engineering Society of China (33):
  • [49] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [50] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976