Activity list representation for a generalization of the resource-constrained project scheduling problem

被引:9
|
作者
Moumene, Khaled [1 ]
Ferland, Jacques A. [1 ]
机构
[1] Univ Montreal, Dept Informat & Rech Operat, Montreal, PQ H3C 3J7, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Project scheduling; Resource-constrained project scheduling; Generalized resource-constrained project scheduling; Activity list; Activity set list; GENETIC ALGORITHM; SEARCH; HEURISTICS; CLASSIFICATION; PRECEDENCE;
D O I
10.1016/j.ejor.2008.10.030
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Most of the real life scheduling problems include several constraints in addition to the precedence and resource constraints considered in the resource-constrained project scheduling problem (RCPSP). In this paper, we define a generalization of the (RCPSP) with a wide class of additional constraints, including (but not limited to): a pair of activities must be separated by at least a given duration; a subset of activities cannot be processed simultaneously; an activity cannot start before a particular period; an activity cannot be scheduled in a particular time window; there are resource constraints with varying required and available quantities. We show that for this generalization the activity list and the activity set list representations can be used as efficiently as in the (RCPSP) and that by using these representations the optimal Solution can always be reached. This allows most of the known solution procedures for (RCPSP) based on these representations to be extended for the generalized (RCPSP) by simply replacing the classical decoding procedure used for the (RCPSP) with the generalized version introduced here. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:46 / 54
页数:9
相关论文
共 50 条
  • [1] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [2] Scheduling resource-constrained project problem with alternative activity chains
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 288 - 296
  • [3] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [4] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    [J]. IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [5] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [6] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 153
  • [7] New representation to reduce the search space for the resource-constrained project scheduling problem
    Moumene, Khaled
    Ferland, Jacques A.
    [J]. RAIRO-OPERATIONS RESEARCH, 2008, 42 (02) : 215 - 228
  • [8] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [9] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [10] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50