A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

被引:0
|
作者
Wang, Wei [1 ]
Shou, Yongyi [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou, Zhejiang, Peoples R China
关键词
Project Scheduling; Robust Optimization; Uncertain Activity Durations; Ant Colony Algorithm;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In researches of project scheduling, the majority is based on the hypothesis that the activity duration is deterministic. However, in the real world, a major challenge comes from the stochastic activity durations. In this paper, the current methods for the recourse-constraint project scheduling problem with uncertain activity durations' are reviewed and their deficiencies are discussed. Then, combining with the robust optimization concept, a new robust optimization model is proposed for the recourse-constraint project scheduling problem, in order to reduce the turbulence caused by uncertain activity durations during the project implementation, and to improve the robustness of the project schedules. A case example is employed to illustrate the new robust model. An ant colony algorithm is integrated to solve the above mentioned problem and to generate a robust solution. The project schedule is also tested in various scenarios to analyze its robustness. The results are discussed in details to explore potential opportunities of further extensions and improvement of the proposed model.
引用
收藏
页码:2376 / 2381
页数:6
相关论文
共 50 条
  • [1] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [2] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Christian Artigues
    Roel Leus
    Fabrice Talla Nobibon
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
  • [3] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Leus, R.
    Artigues, C.
    Nobibon, F. Talla
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
  • [4] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [5] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Afruzi, E. Nabipoor
    Aghaie, A.
    Najafi, A. A.
    [J]. SCIENTIA IRANICA, 2020, 27 (01) : 361 - 376
  • [6] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi, E.
    Aghaie, A.
    Najafi, A.A.
    [J]. Scientia Iranica, 2020, 27 (1 E) : 361 - 376
  • [7] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [8] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    [J]. INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [9] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    [J]. International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
  • [10] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457