Resource-constrained project scheduling problem with uncertain durations and renewable resources

被引:0
|
作者
Weimin Ma
Yangyang Che
Hu Huang
Hua Ke
机构
[1] Tongji University,School of Economics and Management
关键词
Resource-constrained project scheduling; Uncertain duration; Genetic algorithm; Uncertainty theory; Renewable resource;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained project scheduling problem is to make a schedule for minimization of the makespan subject to precedence and resource constraints. In this paper, we consider an uncertain resource-constrained project scheduling problem (URCPSP) in which the activity durations, with no historical data generally, are estimated by experts. In order to deal with these estimations, an uncertainty-theory-based project scheduling model is proposed. Furthermore, a genetic algorithm integrating a 99-method based uncertain simulation is designed to search the quasi-optimal schedule. Numerical examples are also provided to illustrate the effectiveness of the model and the algorithm.
引用
收藏
页码:613 / 621
页数:8
相关论文
共 50 条
  • [31] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [32] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [33] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [34] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [35] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [36] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [37] A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
    Watermeyer, Kai
    Zimmermann, Juergen
    OR SPECTRUM, 2020, 42 (02) : 427 - 460
  • [38] A heuristic approach for resource constrained project scheduling with uncertain activity durations
    Bruni, M. E.
    Beraldi, P.
    Guerriero, F.
    Pinto, E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1305 - 1318
  • [39] Simulation Library for Resource Constrained Project Scheduling with Uncertain Activity Durations
    Brcic, Mario
    Hlupic, Nikica
    2014 37TH INTERNATIONAL CONVENTION ON INFORMATION AND COMMUNICATION TECHNOLOGY, ELECTRONICS AND MICROELECTRONICS (MIPRO), 2014, : 1041 - 1046
  • [40] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114