Resource-constrained project scheduling problem with uncertain durations and renewable resources

被引:0
|
作者
Weimin Ma
Yangyang Che
Hu Huang
Hua Ke
机构
[1] Tongji University,School of Economics and Management
关键词
Resource-constrained project scheduling; Uncertain duration; Genetic algorithm; Uncertainty theory; Renewable resource;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained project scheduling problem is to make a schedule for minimization of the makespan subject to precedence and resource constraints. In this paper, we consider an uncertain resource-constrained project scheduling problem (URCPSP) in which the activity durations, with no historical data generally, are estimated by experts. In order to deal with these estimations, an uncertainty-theory-based project scheduling model is proposed. Furthermore, a genetic algorithm integrating a 99-method based uncertain simulation is designed to search the quasi-optimal schedule. Numerical examples are also provided to illustrate the effectiveness of the model and the algorithm.
引用
下载
收藏
页码:613 / 621
页数:8
相关论文
共 50 条
  • [21] Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
    Ballestin, Francisco
    Leus, Roel
    PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) : 459 - 474
  • [22] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Gafarov, Evgeny R.
    Lazarev, Alexander A.
    Werner, Frank
    ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 115 - 130
  • [23] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Evgeny R. Gafarov
    Alexander A. Lazarev
    Frank Werner
    Annals of Operations Research, 2014, 213 : 115 - 130
  • [24] Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (04) : 2001 - 2020
  • [25] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [26] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [27] Resource-constrained project scheduling under uncertain activity duration
    Willis, RJ
    Pan, HQ
    Yeh, CH
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 429 - 434
  • [28] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [29] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817
  • [30] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50