共 50 条
- [1] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [2] Resource-constrained project scheduling - Minimization of project duration [J]. PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174
- [3] Robust optimization for resource-constrained project scheduling with uncertain activity durations [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
- [4] Robust optimization for resource-constrained project scheduling with uncertain activity durations [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
- [8] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
- [10] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities [J]. Journal of Scheduling, 2008, 11 : 121 - 136