Simulation Library for Resource Constrained Project Scheduling with Uncertain Activity Durations

被引:0
|
作者
Brcic, Mario [1 ]
Hlupic, Nikica [1 ]
机构
[1] Fac Elect Engn & Comp, Zagreb, Croatia
关键词
POLICIES;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Stochastic Resource Constrained Project Scheduling (SRCPS) is among the hardest combinatorial problems. Exact calculations of interesting measures, such as expected project duration and the probability of satisfying the deadline, using known probabilities are in #P even for relaxed instances of the problem where resource constraints are ignored. The most common approach is to use substantial simulation to evaluate candidate solutions. All of the work so far uses ad-hoc developed simulation environments with prevalent use of a priori generated activity duration scenarios. This paper describes the discrete-time simulation library aimed to support the creation of simulation-based algorithms for solving SRCPS problems with known probability distributions of activity durations. The library is designed, in the first instance, with shared memory parallelization of simulation, using OpenMP. Runtime parallelized generation of random activity duration scenarios is supported and we deal with "inconveniences" that are otherwise elegantly avoided using a priori generated activity duration scenarios. However, in some approaches that is not feasible and runtime scenario generation has to be used. We propose modular organization of simulators that enables better reuse of basic intrinsic project scheduling functionality.
引用
收藏
页码:1041 / 1046
页数:6
相关论文
共 50 条
  • [1] Resource constrained project scheduling with uncertain activity durations
    Chakrabortty, Ripon K.
    Sarker, Ruhul A.
    Essam, Daryl L.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 537 - 550
  • [2] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [3] A heuristic approach for resource constrained project scheduling with uncertain activity durations
    Bruni, M. E.
    Beraldi, P.
    Guerriero, F.
    Pinto, E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1305 - 1318
  • [4] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Christian Artigues
    Roel Leus
    Fabrice Talla Nobibon
    Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
  • [5] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [6] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Leus, R.
    Artigues, C.
    Nobibon, F. Talla
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
  • [7] Robustifying the resource-constrained project scheduling against uncertain durations
    Fu, Fang
    Liu, Qi
    Yu, Guodong
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [8] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
    Wang, Wei
    Shou, Yongyi
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
  • [9] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [10] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621