Simulation Library for Resource Constrained Project Scheduling with Uncertain Activity Durations

被引:0
|
作者
Brcic, Mario [1 ]
Hlupic, Nikica [1 ]
机构
[1] Fac Elect Engn & Comp, Zagreb, Croatia
关键词
POLICIES;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Stochastic Resource Constrained Project Scheduling (SRCPS) is among the hardest combinatorial problems. Exact calculations of interesting measures, such as expected project duration and the probability of satisfying the deadline, using known probabilities are in #P even for relaxed instances of the problem where resource constraints are ignored. The most common approach is to use substantial simulation to evaluate candidate solutions. All of the work so far uses ad-hoc developed simulation environments with prevalent use of a priori generated activity duration scenarios. This paper describes the discrete-time simulation library aimed to support the creation of simulation-based algorithms for solving SRCPS problems with known probability distributions of activity durations. The library is designed, in the first instance, with shared memory parallelization of simulation, using OpenMP. Runtime parallelized generation of random activity duration scenarios is supported and we deal with "inconveniences" that are otherwise elegantly avoided using a priori generated activity duration scenarios. However, in some approaches that is not feasible and runtime scenario generation has to be used. We propose modular organization of simulators that enables better reuse of basic intrinsic project scheduling functionality.
引用
收藏
页码:1041 / 1046
页数:6
相关论文
共 50 条
  • [21] Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations
    Zheng Zheng
    Lin Shumin
    Guo Ze
    Zhu Yueni
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2013, 6 (03) : 530 - 547
  • [22] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Lamas, Patricio
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (04) : 409 - 428
  • [23] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Patricio Lamas
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 409 - 428
  • [24] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):
  • [25] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H.
    Zarandi, M. H. Fazel
    Alipouri, Y.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2013, 11 (3A) : 189 - 198
  • [26] DISTRIBUTED SIMULATION OF RESOURCE CONSTRAINED PROJECT SCHEDULING
    ARORA, RK
    SACHDEVA, RK
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (04) : 295 - 304
  • [27] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [28] An evolutionary approach for resource constrained project scheduling with uncertain changes
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    Coello Coello, Carlos A.
    COMPUTERS & OPERATIONS RESEARCH, 2021, 125
  • [29] Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (04) : 2001 - 2020
  • [30] Project Scheduling for Maximum NPV with Variable Activity Durations and Uncertain Activity Outcomes
    Creemers, S.
    Leus, R.
    De Reyck, B.
    Lambrecht, M.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 183 - +