共 50 条
- [23] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations Journal of Scheduling, 2016, 19 : 409 - 428
- [24] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):
- [30] Project Scheduling for Maximum NPV with Variable Activity Durations and Uncertain Activity Outcomes IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 183 - +