- [1] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations [J]. Journal of Scheduling, 2016, 19 : 409 - 428
- [2] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
- [5] The proactive and reactive resource-constrained project scheduling problem [J]. Journal of Scheduling, 2019, 22 : 211 - 237
- [7] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [10] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647