The preemptive stochastic resource-constrained project scheduling problem

被引:23
|
作者
Creemers, Stefan [1 ,2 ]
机构
[1] IESEG Sch Management, LEM CNRS 9221, Rue Digue 3, F-59000 Lille, France
[2] Katholieke Univ Leuven, Res Ctr Operat Management, Naamsestr 69, B-3000 Leuven, Belgium
关键词
Project scheduling; Resource constraints; Preemption; Stochastic durations; Continuous-time Markov chain; ALGORITHMS; DELAY;
D O I
10.1016/j.ejor.2019.02.030
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Preemption (or the splitting of activities) is a common practice in many project environments, and has been a standard feature of commercial project management software packages for years. Despite its prevalence in daily practice, preemption has received little attention in the project scheduling literature. A possible explanation for this lack of research interest is the common assumption that preemption only has a limited impact on the optimal makespan of a project. In this article, however, we show that the benefit of preemption can be significant, and that it increases with the size and the complexity of the project network. In addition, we also investigate how activity duration variability impacts the benefits of preemption. To this end, we study the preemptive stochastic resource-constrained project scheduling problem (PSRCPSP), and present an exact solution procedure. Even though the deterministic preemptive resource-constrained project scheduling problem (PRCPSP) has received some attention in the literature, we are the first to study the PSRCPSP. We use hypoexponential distributions to model the activity durations, and define a new continuous-time Markov chain (CTMC) that drastically reduces memory requirements when compared to the well-known CTMC of Kulkarni and Adlakha (1986) (Operations Research, 34(5), 769-781). In addition, we also propose a new and efficient approach to structure the state space of the CTMC. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:238 / 247
页数:10
相关论文
共 50 条
  • [1] Proactive policies for the stochastic resource-constrained project scheduling problem
    Deblaere, Filip
    Demeulemeester, Erik
    Herroelen, Willy
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 308 - 316
  • [2] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [3] An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 334 - 348
  • [4] New Benchmark Results for the Stochastic Resource-Constrained Project Scheduling Problem
    Leus, Roel
    Rostami, Salim
    Creemers, Stefan
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 204 - 208
  • [5] Efficient priority rules for the stochastic resource-constrained project scheduling problem
    Chen, Zhi
    Demeulemeester, Erik
    Bai, Sijun
    Guo, Yuntao
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 270 (03) : 957 - 967
  • [6] Stochastic rollout and justification to solve the resource-constrained project scheduling problem
    Xu, Ningxiong
    Nozick, Linda
    Bernstein, Orr
    Jones, Dean
    [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1799 - 1806
  • [7] A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources
    Delgoshaei, Aidin
    Hanjani, Sepehr Esmaeili
    Nasiri, Amir Hossein
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 195 - 212
  • [8] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [9] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    [J]. IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [10] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 153