共 50 条
- [31] A bi-objective Model for Robust Resource-constrained Project Scheduling Problem with Random Activity Durations 2015 IEEE 12th International Conference on Networking, Sensing and Control (ICNSC), 2015, : 28 - 32
- [33] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities Journal of Scheduling, 2008, 11 : 121 - 136
- [37] Sounds of Silence: a sampling-based bi-criteria harmony search metaheuristic for the resource constrained project scheduling problem with uncertain activity durations and cash flows PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2014, 58 (02): : 93 - 104
- [39] Heuristic for network project scheduling with random activity durations depending on the resource allocation Int J Prod Econ, 2 (149-162):