Identifying factors causing cost overrun of the construction projects in India

被引:0
|
作者
Swapnil P Wanjari
Gaurav Dobariya
机构
[1] Visvesvaraya National Institute of Technology,Department of Civil Engineering
来源
Sādhanā | 2016年 / 41卷
关键词
Cost overrun in India; ANOVA; factor analysis; construction projects;
D O I
暂无
中图分类号
学科分类号
摘要
Delay and cost overrun are common phenomena in projects worldwide. However, these are especially severe in developing countries. In India as per MOSPI report, 235 projects out of 410 were severely affected cost overrun due to certain factors. A short questionnaire was conducted with 15 prominent factors responsible for cost overrun and forwarded to 190 constructional professionals across India. Total 85 responses were received and it was analyzed using various statistical tools such as analysis of variance (ANOVA) and factor analysis tool using SPSS. In this study, top three factors affecting cost overruns were identified such as price escalation of raw material, delay in planned activity and lack of co-ordination between construction parties which could be significantly responsible for cost overnun of construction project in India. Factor analysis method was also carried out to group the factors into three components of overall questionnaire. These components, such as client control component, project management component, and contractor control component, would be useful to the various parties involved in the construction activities. This paper also provides suggestive frameworks which have been framed after discussing with large number of construction professionals or expert.
引用
收藏
页码:679 / 693
页数:14
相关论文
共 50 条
  • [41] Evaluation of Cost Overrun in Construction Projects during COVID-19 Pandemic
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (01)
  • [42] Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects
    Ghazal, Mai Monir
    Hammad, Ahmed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (09) : 1632 - 1646
  • [43] Categorization of potential project cost overrun factors in construction industry
    Karunakaran, P.
    Abdullah, A. H.
    Nagapan, S.
    Sohu, S.
    Kasvar, K. K.
    [J]. 4TH INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2017), 2018, 140
  • [44] Effect of Critical Risk Factors Causing Cost Deviation in Medium Sized Construction Projects
    Renuka, Senthil Muthalvan
    Umarani, Chockkalingam
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2018, 23 (02) : 63 - 85
  • [45] Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation
    Sanchez, Omar
    Castaneda, Karen
    Herrera, Rodrigo F.
    Pellicer, Eugenio
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 472 - 482
  • [46] Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Jhatial, Ashfaque Ahmed
    Ullah, Kaleem
    Bhatti, Imtiaz Ali
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (02) : 2770 - 2774
  • [47] Contractors Perspective for Critical Factors of Cost Overrun in Highway Projects of Sindh, Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Fattah, Abdul
    Ullah, Kaleem
    Kumar, Kanesh
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY AND AWAM INTERNATIONAL CONFERENCE IN CIVIL ENGINEERING (IGNITE-AICCE'17): SUSTAINABLE TECHNOLOGY AND PRACTICE FOR INFRASTRUCTURE AND COMMUNITY RESILIENCE, 2017, 1892
  • [48] Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan
    Akhund, Muhammad Akram
    Khoso, Ali Raza
    Pathan, Ashfaque Ahmed
    Imad, Hafiz Usama
    Siddiqui, Fida
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (04) : 3260 - 3264
  • [49] Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan
    Shaikh, Fazal Ali
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (01) : 5247 - 5250
  • [50] Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach
    Ashtari, Mohammad Amin
    Ansari, Ramin
    Hassannayebi, Erfan
    Jeong, Jaewook
    [J]. BUILDINGS, 2022, 12 (10)