Categorization of potential project cost overrun factors in construction industry

被引:9
|
作者
Karunakaran, P. [1 ]
Abdullah, A. H. [1 ]
Nagapan, S. [1 ]
Sohu, S. [1 ]
Kasvar, K. K. [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil & Environm Engn FKAAS, Batu Pahat 86400, Johor Darul Tak, Malaysia
关键词
D O I
10.1088/1755-1315/140/1/012098
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Factors contributing to project time and hence cost overrun in the Malaysian construction industry
    Shehu, Zayyana
    Endut, Intan
    Akintoye, Akintola
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) : 55 - +
  • [2] An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry
    Dada, Joshua
    Jagboro, G.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (01) : 37 - +
  • [3] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Savita Sharma
    Pradeep K. Goyal
    Evolutionary Intelligence, 2022, 15 : 2269 - 2281
  • [4] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Sharma, Savita
    Goyal, Pradeep K.
    EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2269 - 2281
  • [5] A study and identification of the time and cost overrun in the construction project
    Chandragiri, Anand babu
    Jeelani, Syed Hamim
    Akthar, Salim
    Lingeshwaran, N.
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5426 - 5431
  • [6] Overrun Factors During the Construction Phase of Project
    Muhammad, Raja Khan
    Rahman, Ismail Abdul
    Nagapan, Sasitharan
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 96 - 102
  • [7] Cost overrun and time delay of construction project in Indonesia
    Susanti, Riza
    8TH ENGINEERING INTERNATIONAL CONFERENCE 2019, 2020, 1444
  • [8] Time-overrun factors in Nigerian construction industry
    Elinwa, AU
    Joshua, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 419 - 425
  • [9] An analysis of causes of delay and cost overrun in construction of hydropower project
    Azam, Tamoor
    Jiang, Wang Song
    Malik, Sohail Ahmed
    Malik, Saqib Yaqoob
    Nilofar, Memoona
    Abbas, Zaheer
    Ullah, Ihsan
    JOURNAL OF PUBLIC AFFAIRS, 2022, 22 (03)
  • [10] Cost overrun in the Malaysian construction industry projects: A deeper insight
    Shehu, Zayyana
    Endut, Intan Rohani
    Akintoye, Akintola
    Holt, Gary D.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (08) : 1471 - 1480