Categorization of potential project cost overrun factors in construction industry

被引:9
|
作者
Karunakaran, P. [1 ]
Abdullah, A. H. [1 ]
Nagapan, S. [1 ]
Sohu, S. [1 ]
Kasvar, K. K. [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil & Environm Engn FKAAS, Batu Pahat 86400, Johor Darul Tak, Malaysia
关键词
D O I
10.1088/1755-1315/140/1/012098
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Research on the total cost factors of construction project
    Zhu Xianghua
    Liu Yisheng
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 262 - 266
  • [42] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Jung, Ji Hyun
    Kim, Dae Young
    Lee, Hak Ki
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1119 - 1130
  • [43] Assessing Construction Constraint Factors on Project Performance in the Construction Industry
    Masoetsa, Tshweu Given
    Ogunbayo, Babatunde Fatai
    Aigbavboa, Clinton Ohis
    Awuzie, Bankole Osita
    BUILDINGS, 2022, 12 (08)
  • [44] Uncertainties-Based Potential Time and Cost Overrun Assessment While Planning a Hydropower Project
    Kansal, Mitthan Lal
    Agarwal, Sanchit Saran
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2022, 8 (04)
  • [45] Construction time overrun as a function of risk factors
    Zujo, Vahida
    Car-Pusic, Diana
    GRADEVINAR, 2009, 61 (08): : 721 - 729
  • [46] COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY
    Derakhshanalavijeh, Roya
    Cardoso Teixeira, Jose Manuel
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (01) : 125 - 136
  • [47] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Ji Hyun Jung
    Dae Young Kim
    Hak Ki Lee
    KSCE Journal of Civil Engineering, 2016, 20 : 1119 - 1130
  • [48] Factors for Time and Cost Overrun in Public Projects
    Idrees S.
    Shafiq M.T.
    Journal of Engineering, Project, and Production Management, 2021, 11 (03) : 243 - 254
  • [49] Research on Influencing Factors and Control Measures of Construction Cost Overrun in China's Expressway Projects
    Chen S.
    Fan X.
    Cai B.
    International Journal of Fuzzy System Applications, 2023, 12 (01)
  • [50] Collaborative factors of project success in construction industry in China
    Cheng, Yu
    Yang, Yuhong
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 301 - 309