共 50 条
- [1] Time Delay and Cost Overrun in Qatari Public Construction Projects [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 368 - 375
- [6] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
- [7] Causative Factors of Cost Overrun in Building Projects of Pakistan [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (09): : 122 - 126
- [8] Ranking of the Factors Causing Cost Overrun in Infrastructural Projects of UAE [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 204 - 211
- [9] Identifying factors causing cost overrun of the construction projects in India [J]. Sādhanā, 2016, 41 : 679 - 693
- [10] UNEARTHING CAUSATIVE FACTORS OF COST OVERRUN ON GHANAIAN ROAD PROJECTS [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2022, 17 (04): : 171 - 188