Factors for Time and Cost Overrun in Public Projects

被引:10
|
作者
Idrees, Shehryar [1 ]
Shafiq, Muhammad Tariq [2 ]
机构
[1] Department of Industrial and Manufacturing Engineering, UET, Lahore, Pakistan
[2] Department of Architecture Engineering, UAE University, Al-Ain, United Arab Emirates
关键词
D O I
10.2478/jeppm-2021-0023
中图分类号
学科分类号
摘要
引用
收藏
页码:243 / 254
相关论文
共 50 条
  • [1] Time Delay and Cost Overrun in Qatari Public Construction Projects
    Senouci, Ahmed
    Ismail, Alaa
    Eldin, Neil
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 368 - 375
  • [2] Contributing Factors of Time Overrun in Public Sector Construction Projects
    Akhund, Muhammad Akram
    Imad, Hafiz Usama
    Memon, Nafees Ahmed
    Siddiqui, Fida Hussain
    Khoso, Ali Raza
    Panhwar, Abbas Ali
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (05) : 3369 - 3372
  • [3] Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects
    Wyke, Simon
    Lindhard, Soren Munch
    Larsen, Jesper Kranker
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (06) : 2415 - 2436
  • [4] Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects
    Matin, Danial Mirzai
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (04) : 1062 - 1066
  • [5] Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
    Larsen, Jesper Kranker
    Shen, Geoffrey Qiping
    Lindhard, Soren Munch
    Brunoe, Thomas Ditlev
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [6] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors
    Manzano-Alvarado, Mateo
    Montalban-Domingo, Laura
    Garcia-Segura, Tatiana
    Sanz-Benlloch, Amalia
    Pellicer, Eugenio
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
  • [7] Causative Factors of Cost Overrun in Building Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Memon, Nafees Ahmed
    Yunus, Riduan
    Hasmori, Muhammad Fikri
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (09): : 122 - 126
  • [8] Ranking of the Factors Causing Cost Overrun in Infrastructural Projects of UAE
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 204 - 211
  • [9] Identifying factors causing cost overrun of the construction projects in India
    Swapnil P Wanjari
    Gaurav Dobariya
    [J]. Sādhanā, 2016, 41 : 679 - 693
  • [10] UNEARTHING CAUSATIVE FACTORS OF COST OVERRUN ON GHANAIAN ROAD PROJECTS
    Akinradewo, Opeoluwa
    Aigbavboa, Clinton
    Oke, Ayodeji
    Coffie, Harrison
    Ogunbayo, Babatunde
    [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2022, 17 (04): : 171 - 188