Identifying factors causing cost overrun of the construction projects in India

被引:0
|
作者
Swapnil P Wanjari
Gaurav Dobariya
机构
[1] Visvesvaraya National Institute of Technology,Department of Civil Engineering
来源
Sādhanā | 2016年 / 41卷
关键词
Cost overrun in India; ANOVA; factor analysis; construction projects;
D O I
暂无
中图分类号
学科分类号
摘要
Delay and cost overrun are common phenomena in projects worldwide. However, these are especially severe in developing countries. In India as per MOSPI report, 235 projects out of 410 were severely affected cost overrun due to certain factors. A short questionnaire was conducted with 15 prominent factors responsible for cost overrun and forwarded to 190 constructional professionals across India. Total 85 responses were received and it was analyzed using various statistical tools such as analysis of variance (ANOVA) and factor analysis tool using SPSS. In this study, top three factors affecting cost overruns were identified such as price escalation of raw material, delay in planned activity and lack of co-ordination between construction parties which could be significantly responsible for cost overnun of construction project in India. Factor analysis method was also carried out to group the factors into three components of overall questionnaire. These components, such as client control component, project management component, and contractor control component, would be useful to the various parties involved in the construction activities. This paper also provides suggestive frameworks which have been framed after discussing with large number of construction professionals or expert.
引用
收藏
页码:679 / 693
页数:14
相关论文
共 50 条
  • [1] Identifying factors causing cost overrun of the construction projects in India
    Wanjari, Swapnil P.
    Dobariya, Gaurav
    [J]. SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2016, 41 (06): : 679 - 693
  • [2] Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects
    Matin, Danial Mirzai
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (04) : 1062 - 1066
  • [3] Ranking of the Factors Causing Cost Overrun in Infrastructural Projects of UAE
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 204 - 211
  • [4] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Sharma, Savita
    Goyal, Pradeep K.
    [J]. EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2269 - 2281
  • [5] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Savita Sharma
    Pradeep K. Goyal
    [J]. Evolutionary Intelligence, 2022, 15 : 2269 - 2281
  • [6] Structural model of cost overrun factors affecting Pakistani construction projects
    Memon, Aftab Hameed
    Memon, Abdul Qadir
    Memon, Muneeb Ayub
    Sahito, Jam Shahzeb Khan
    [J]. MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2023, 42 (02) : 108 - 123
  • [7] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    [J]. SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [8] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    [J]. SUSTAINABILITY, 2018, 10 (12)
  • [9] Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects
    Annamalaisami, Cindrela Devi
    Kuppuswamy, Ananthanarayanan
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2021, 7 (02):
  • [10] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83