Contractors Perspective for Critical Factors of Cost Overrun in Highway Projects of Sindh, Pakistan

被引:10
|
作者
Sohu, Samiullah [1 ]
Abdullah, Abd Halid [1 ]
Nagapan, Sasitharan [1 ]
Fattah, Abdul [2 ]
Ullah, Kaleem [1 ]
Kumar, Kanesh [1 ]
机构
[1] UTHM Malaysia, Fac Civil & Environm Engn, Batu Pahat 86400, Johor, Malaysia
[2] Quaid e Awam Univ, Coll Sci & Technol Larkano, Sindh, Pakistan
关键词
CONSTRUCTION PROJECTS;
D O I
10.1063/1.5005728
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Causative factors of cost overrun in highway projects of Sindh province of Pakistan
    Sohu, S.
    Halid, A.
    Nagapan, S.
    Fattah, A.
    Latif, I.
    Ullah, K.
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [2] Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Jhatial, Ashfaque Ahmed
    Ullah, Kaleem
    Bhatti, Imtiaz Ali
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (02) : 2770 - 2774
  • [3] Controlling Measures for Cost Overrun Causes in Highway Projects of Sindh Province
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Rind, Touqeer Ali
    Jhatial, Ashfaque Ahmed
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (03) : 4276 - 4280
  • [4] Causative Factors of Cost Overrun in Building Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Memon, Nafees Ahmed
    Yunus, Riduan
    Hasmori, Muhammad Fikri
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (09): : 122 - 126
  • [5] Mitigation Measures for Significant Factors Instigating Cost Overrun in Highway Projects
    Sohu, Samiullah
    Bin Abdullah, Abd Halid
    Memon, Bashir Ahmed
    Nagapan, Sasitharan
    Bhatti, Nadeem Ul Kareem
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (10): : 2338 - 2344
  • [6] Key driving factors of cost overrun in highway infrastructure projects in Nigeria: a context-based perspective
    Mahmud, Abba Tahir
    Ogunlana, Stephen O.
    Hong, W. T.
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (06) : 1530 - 1555
  • [7] Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects
    Creedy, Garry D.
    Skitmore, Martin
    Wong, Johnny K. W.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 528 - 537
  • [8] Severity of Time Overrun Causes in Road Construction Projects: Contractors' Perspective
    Mahamid, Ibrahim
    Bruland, Amund
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 191 - 194
  • [9] Determining the Critical Success Factors for Highway Construction Projects in Pakistan
    Sohu, Samiullah
    Jhatial, Ashfaque Ahmed
    Ullah, Kaleem
    Lakhiar, Muhammad Tahir
    Shahzaib, Jam
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (02) : 2685 - 2688
  • [10] Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
    Xie, Wenwen
    Deng, Binchao
    Yin, Yilin
    Lv, Xindong
    Deng, Zhenhua
    [J]. BUILDINGS, 2022, 12 (11)