Contractors Perspective for Critical Factors of Cost Overrun in Highway Projects of Sindh, Pakistan

被引:10
|
作者
Sohu, Samiullah [1 ]
Abdullah, Abd Halid [1 ]
Nagapan, Sasitharan [1 ]
Fattah, Abdul [2 ]
Ullah, Kaleem [1 ]
Kumar, Kanesh [1 ]
机构
[1] UTHM Malaysia, Fac Civil & Environm Engn, Batu Pahat 86400, Johor, Malaysia
[2] Quaid e Awam Univ, Coll Sci & Technol Larkano, Sindh, Pakistan
关键词
CONSTRUCTION PROJECTS;
D O I
10.1063/1.5005728
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Evaluation of Risk Factors Causing Cost Overrun in Road Projects in Terrorism Affected Areas Pakistan - a Case Study
    Zafar, Irfan
    Yousaf, Tashfeen
    Ahmed, Sarfraz
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (05) : 1613 - 1620
  • [22] Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study
    Irfan Zafar
    Tashfeen Yousaf
    Dr Sarfraz Ahmed
    KSCE Journal of Civil Engineering, 2016, 20 : 1613 - 1620
  • [23] A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan
    Zafar, Irfan
    Wuni, Ibrahim Y.
    Shen, Geoffrey Q. P.
    Ahmed, Sarfraz
    Yousaf, Tashfeen
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 732 - 750
  • [24] Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach
    Abu El-Maaty, Ahmed Ebrahim
    El-Kholy, Amr M.
    Akal, Ahmed Yousry
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 809 - 827
  • [25] Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana
    Nuako, Francis
    Ghansah, Frank Ato
    Adusei, Thomas
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [26] Factors adversely affecting quality in highway projects of Pakistan
    Sohu, Samiullah
    Ullah, Kaleem
    Jhatial, Ashfaque Ahmed
    Jaffar, Muhammad
    Lakhiar, Muhammad Tahir
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2018, 5 (10): : 62 - 66
  • [27] Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan
    Shaikh, Fazal Ali
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (01) : 5247 - 5250
  • [28] Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan
    Akhund, Muhammad Akram
    Khoso, Ali Raza
    Pathan, Ashfaque Ahmed
    Imad, Hafiz Usama
    Siddiqui, Fida
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (04) : 3260 - 3264
  • [29] SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE
    Enshassi, Adnan
    Kumaraswamy, Mohan
    Al-Najjar, Jomah
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) : 35 - 60
  • [30] EXPLORING CRITICAL SUCCESS FACTORS FOR DEVELOPING INFRASTRUCTURE PROJECTS IN MALAYSIA-MAIN CONTRACTORS' PERSPECTIVE
    Jin, Xiao-Hua
    Tan, Hai Chen
    Zuo, Jian
    Feng, Yingbin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2012, 12 (03) : 25 - 41