Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan

被引:0
|
作者
Akhund, Muhammad Akram [1 ]
Khoso, Ali Raza [2 ]
Pathan, Ashfaque Ahmed [2 ]
Imad, Hafiz Usama [1 ]
Siddiqui, Fida [2 ]
机构
[1] ISRA Univ, Dept Civil Engn, Hyderabad, Telangana, India
[2] Mehran Univ Engn & Technol, Dept Civil Engn, Jamshoro, Pakistan
关键词
joint venture; risk; construction; Pakistan;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Business collaborations formed by construction contractors to enhance their abilities and effectiveness in large construction projects are known as construction joint ventures (CJVs). It is widely used as a way of merging assets, capitals, funds, resources and expertise of different organizations. It helps business to grow faster, increase efficiency and generate greater profits without borrowing money. Though it is useful and beneficent for the vendors, it may contain several types of risk. It is both beneficial and stimulating due to differing technical skills, economic and political atmospheres, and cultural and legal backgrounds. Recent development and modernization in Pakistan have led it towards a new construction phase, which involves national and multinational joint venture projects. Global and local CJVs have become gradually prevalent to produce mega construction projects. Current research aims to investigate and to identify the communal, ecological, political, legal, economic and other external risks associated with CJV projects in Pakistan. The study was carried out by literature review and a few national and international guidelines. Interviews were conducted with relevant professionals, experts, and owners of the organizations working on CJV projects. Data was collected in the form of a questionnaire from relevant professionals. The descriptive analysis was performed through SPSS using average index (A.I) technique. This study is helpful for the Government of Pakistan, public and private construction firms working under JV to reduce the emerging risks of construction projects.
引用
收藏
页码:3260 / 3264
页数:5
相关论文
共 50 条
  • [1] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    [J]. SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [2] Causes of Time Overrun in Construction of Building Projects in Pakistan
    Soomro, Faheem Ahmed
    Memon, Muhammed Jaffar
    Chandio, Abdul Fattah
    Sohu, Samiullah
    Soomro, Rizwanullah
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (01) : 3762 - 3764
  • [3] Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan
    Shaikh, Fazal Ali
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (01) : 5247 - 5250
  • [4] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors
    Manzano-Alvarado, Mateo
    Montalban-Domingo, Laura
    Garcia-Segura, Tatiana
    Sanz-Benlloch, Amalia
    Pellicer, Eugenio
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
  • [5] Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang
    Haslinda, A. Nor
    Xian, T. Wei
    Norfarahayu, K.
    Hanafi, R. Muhamad
    Fikri, H. Muhammad
    [J]. INTERNATIONAL SEMINAR ON MATHEMATICS AND PHYSICS IN SCIENCES AND TECHNOLOGY 2017 (ISMAP 2017), 2018, 995
  • [6] Time Delay and Cost Overrun in Qatari Public Construction Projects
    Senouci, Ahmed
    Ismail, Alaa
    Eldin, Neil
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 368 - 375
  • [7] Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
    Xie, Wenwen
    Deng, Binchao
    Yin, Yilin
    Lv, Xindong
    Deng, Zhenhua
    [J]. BUILDINGS, 2022, 12 (11)
  • [8] Causative Factors of Cost Overrun in Building Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Memon, Nafees Ahmed
    Yunus, Riduan
    Hasmori, Muhammad Fikri
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (09): : 122 - 126
  • [9] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    [J]. SUSTAINABILITY, 2018, 10 (12)
  • [10] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83